| Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
|---|---|---|---|---|---|---|---|---|
| << < 25 26 27 28 29 > >> | ||||||||
| DATACON/Q-BUS interface based on DRV11-P | AD | BNL-105817-2014-TECH | Benenson, G | 06/30/83 | 09/16/14 | PDF File | ||
| Linac momentum spread--a crude measurement | AD | BNL-104022-2014-TECH | Ahrens, L | 06/09/83 | 05/05/14 | PDF File | ||
| Injection machine parameter measurement | AD | BNL-104023-2014-TECH | Ahrens, L | Glenn, J.W. |
06/09/83 | 05/05/14 | PDF File | |
| Comparison of June and September Operation of SBE | AD | BNL-104035-2014-TECH | Chiang, I | Glenn, J.W.; Soukas, A.; Weng, W.T. |
06/09/83 | 05/05/14 | PDF File | |
| Operation at Full B | AD | BNL-104029-2014-TECH | Clancy, M | Gabusi, J.; Gill, E.; Glenn, J.W. |
06/08/83 | 05/05/14 | PDF File | |
| Transport of SBE Beam to the D Target | AD | BNL-104034-2014-TECH | Glenn, J | Ryan, J. |
06/08/83 | 05/05/14 | PDF File | |
| Low intensity studies for polarized protons | AD | BNL-104024-2014-TECH | Sanders, R | 06/07/83 | 05/05/14 | PDF File | ||
| RF Capture at Low B | AD | BNL-104030-2014-TECH | Raka, E | Gill, E.; Weng, W.T. |
06/07/83 | 05/05/14 | PDF File | |
| RF Capture at Zero B | AD | BNL-104032-2014-TECH | Gill, E | Raka, E. |
06/04/83 | 05/05/14 | PDF File | |
| RF Capture of Prebunched Linac Beam at Zero B | AD | BNL-104033-2014-TECH | Ahrens, L | Raka, E.; Weng, W.T. |
06/04/83 | 05/05/14 | PDF File | |
| A Measurement of HEBT momentum spread for a 20 mA ... | AD | BNL-104025-2014-TECH | Barton, M | Reece, R.K.; Witkover, R.L. |
06/03/83 | 05/05/14 | PDF File | |
| Vertical Tune Measurements at Slow Extraction | AD | BNL-104037-2014-TECH | Ahrens, L | Barge, D.A.; Glenn, J.W. |
06/01/83 | 05/05/14 | PDF File | |
| B Line vertical beam size at the B target | AD | BNL-104026-2014-TECH | Glenn, J | 05/31/83 | 05/05/14 | PDF File | ||
| A/D line steering | AD | BNL-104028-2014-TECH | Glenn, J | 05/31/83 | 05/05/14 | PDF File | ||
| Losses at F10 | AD | BNL-104031-2014-TECH | Barge, D | Glenn, J.W. |
05/29/83 | 05/05/14 | PDF File | |
| Inspection Main Magnet Coil with Video Therm Porta ... | AD | BNL-104021-2014-TECH | Zguris, M | Clancy, M.; Farrell, H.; Tombler, E. |
05/05/83 | 05/05/14 | PDF File | |
| Vertical Beam Blowup During Slow Extraction | AD | BNL-104020-2014-TECH | Ahrens, L | Gill, E.; Glenn, J.W. |
04/27/83 | 05/05/14 | PDF File | |
| Search for Intensity Limits on AGS Spiraling Beam | AD | BNL-104019-2014-TECH | Glenn, J | Gill, E,; Ahrens, L. |
04/20/83 | 05/05/14 | PDF File | |
| ACCUMULATOR BOOSTER FOR THE AGS AS A HEAVY ION BOO ... | AD | BNL-104615-2014-TECH | Lee, Y | Smith, L.W. |
04/15/83 | 08/27/14 | PDF File | |
| Ring rf Cavity Shorting Switch--First Commissionin ... | AD | BNL-104018-2014-TECH | Ahrens, L | Frey, W.; Glenn, J.W.; Keane, J.T. |
04/13/83 | 05/05/14 | PDF File | |
| STUDY OF THE INJECTION TO THE AGS ACCUMULATOR BOOS ... | AD | BNL-104614-2014-TECH | Lee, Y | 04/08/83 | 08/27/14 | PDF File | ||
| AGS horizontal and vertical emittance vs energy | AD | BNL-104027-2014-TECH | Ahrens, L | Gill, E.; Weisberg, H. |
03/06/83 | 05/05/14 | PDF File | |
| AGS Beam Blowup by Kr Gas (preliminary of E-778) | AD | BNL-104017-2014-TECH | Hseuh, H | 01/13/83 | 05/05/14 | PDF File | ||
| Summary Of The Physics Review Panel On Heavy Ion C ... | AD | BNL-101398-2014-TECH | Barton, M | Gutbrod, H.; Ludlam, T. |
01/04/83 | 01/24/14 | PDF File | |
| ON-LINE TUNE MEASUREMENTS IN THE AGS | AD | BNL-104613-2014-TECH | Raka, E | 12/20/82 | 08/27/14 | PDF File | ||
| IMPROVED MECHANICAL SEAL FOR ALUMINUM VACUUM WINDO ... | AD | BNL-104612-2014-TECH | Rodger, E | 12/13/82 | 08/27/14 | PDF File | ||
| THE DEAD RECKONING OF THE AGS RING PUE SYSTEM | AD | BNL-104611-2014-TECH | Ahrens, L | 11/24/82 | 08/27/14 | PDF File | ||
| Physics with high intensity polarized protons | AD | BNL-105816-2014-TECH | Bunce, G | 10/21/82 | 09/16/14 | PDF File | ||
| VACUUM CHAMBER RESISTOR-CAPACITOR NETWORKS | AD | BNL-104610-2014-TECH | Sanders, R | 10/13/82 | 08/27/14 | PDF File | ||
| Operation of AGS SWICS incorporating an 8085 micro ... | AD | BNL-105819-2014-TECH | Chiang, I | Sandberg, J.; Soukas, A. |
09/29/82 | 09/16/14 | PDF File | |
| The QTUNE Program--The AGS Extracted Beam Transpor ... | AD | BNL-104609-2014-TECH | Ryan, J | 08/04/82 | 08/27/14 | PDF File | ||
| U-Line Emittance Measurement at U618 by MSEM | AD | BNL-104016-2014-TECH | Chiang, I | Ryan, J.; Smith, G.; Weng, W.T. |
06/07/82 | 05/05/14 | PDF File | |
| Polarities and Connections of High Field Straight ... | AD | BNL-104015-2014-TECH | Barge, D | Feltman, A.; Funaro, J.; Noble, R.; Post, J.; Wei ... |
05/19/82 | 05/05/14 | PDF File | |
| Variation of the Location of the AGS Beam Loss Rad ... | AD | BNL-104014-2014-TECH | Ahrens, L | Glenn, J.W. |
03/18/82 | 05/05/14 | PDF File | |
| EDDY CURRENT EFFECTS OF SEPTUM-BACKLEG SPRINGS I N ... | AD | BNL-104608-2014-TECH | Rodger, E | 03/09/82 | 08/27/14 | PDF File | ||
| Flag Video Profile Generator | AD | BNL-104607-2014-TECH | Frey, W | 01/07/82 | 08/27/14 | PDF File | ||
| The Outgassing of Magnet Laminations | AD | BNL-104606-2014-TECH | Edwards, D | 01/04/82 | 08/27/14 | PDF File | ||
| Pulsed operation of experimental magnet power supp ... | AD | BNL-105813-2014-TECH | Hulliger, R | Soukas, A. |
12/09/81 | 09/16/14 | PDF File | |
| SEC Response to beam halo | AD | BNL-104605-2014-TECH | Glenn, J | 11/29/81 | 08/27/14 | PDF File | ||
| The U Line--1981 | AD | BNL-104604-2014-TECH | Ryan, J | 11/05/81 | 08/27/14 | PDF File | ||
| Gauss Clock Stabilization of the Main Magnet Power ... | AD | BNL-104603-2014-TECH | Lambiase, R | 10/14/81 | 08/27/14 | PDF File | ||
| 20 Kilogauss solenoid magnet | AD | BNL-105815-2014-TECH | Li, J | Fang, G.Y.; Walker, J.C. |
08/28/81 | 09/16/14 | PDF File | |
| AGS Master Clock System | AD | BNL-104602-2014-TECH | Gabusi, J | Gill, E.; Koeppe, P.; Naase, S.; Zaharatos, R. |
08/20/81 | 08/27/14 | PDF File | |
| D-Line Study | AD | BNL-104013-2014-TECH | Bunce, G | Brown, H.; Glenn, J.W.; Naase, S. |
08/05/81 | 05/05/14 | PDF File | |
| The AGS Gauss Clock Reproducibility Test | AD | BNL-104012-2014-TECH | Weng, W | 07/09/81 | 05/05/14 | PDF File | ||
| Beam Profile Monitors for the AGS | AD | BNL-104601-2014-TECH | Weisberg, H | 07/08/81 | 08/27/14 | PDF File | ||
| D-Line study | AD | BNL-105814-2014-TECH | Brown, H | Bunce, G.; Glenn, J.W.; Naase, S. |
07/07/81 | 09/16/14 | PDF File | |
| To Determine Whether or Not F5 Losses Could be Red ... | AD | BNL-104011-2014-TECH | Barge, D | Glenn, J.W. |
07/01/81 | 05/05/14 | PDF File | |
| H5 Fast Kicker Magnet Pulser | AD | BNL-104600-2014-TECH | Frey, W | Ghoshroy, S.; Cottingham, J.G. |
07/01/81 | 08/27/14 | PDF File | |
| Beyond the vending machines: A listing of restaura ... | AD | BNL-105806-2014-TECH | Edwards, S | Lowenstein, E. |
07/01/81 | 09/16/14 | PDF File | |
| How to determine ?T (temperature differential), gi ... | AD | BNL-105812-2014-TECH | Dayton, D | 06/26/81 | 09/16/14 | PDF File | ||
| AGS Internal Targets Operation Note | AD | BNL-104599-2014-TECH | Ryan, J | Gill, E. |
06/15/81 | 08/27/14 | PDF File | |
| SEB Beam Size vs. Intensity | AD | BNL-104010-2014-TECH | Weisberg, H | Glenn, J.W. |
06/11/81 | 05/05/14 | PDF File | |
| MEASUREMENTS OF THE PULSED FIELD IN THE NEW H-5 KI ... | AD | BNL-104598-2014-TECH | Nawrocky, R | 05/12/81 | 08/27/14 | PDF File | ||
| The H5 Kicker Test | AD | BNL-104009-2014-TECH | Weng, W | 05/07/81 | 05/05/14 | PDF File | ||
| Data plotting and resistance calculation program | AD | BNL-105811-2014-TECH | Ewing, B | 04/29/81 | 09/16/14 | PDF File | ||
| Costs of running FEB and SEB programs - combined a ... | AD | BNL-105810-2014-TECH | Carroll, A | 04/01/81 | 09/16/14 | PDF File | ||
| Looping analog data taking programs | AD | BNL-105809-2014-TECH | Stoehr, R | 03/13/81 | 09/16/14 | PDF File | ||
| BUFFER READER MULTIPLEX SYSTEM | AD | BNL-104597-2014-TECH | Dabrowski, J | Gill, E; Naase, S. |
03/04/81 | 08/27/14 | PDF File | |
| MORE SEB EMITTANCE MEASUREMENTS | AD | BNL-104596-2014-TECH | Weisberg, H | 02/17/81 | 08/27/14 | PDF File | ||
| Spectrum Analysis of LL Noise Under Synchronizatio ... | AD | BNL-104008-2014-TECH | Raka, E | Claus, J.; Cornacchia, M.; Gill, E.; Poole, J. |
02/06/81 | 05/05/14 | PDF File | |
| Synchronization of the AGS rf to External Oscillat ... | AD | BNL-104006-2014-TECH | Raka, E | 01/30/81 | 05/05/14 | PDF File | ||
| SEB Size Comparison | AD | BNL-104007-2014-TECH | Ryan, J | 12/10/80 | 05/05/14 | PDF File | ||
| SEC Response Continued | AD | BNL-104005-2014-TECH | Glenn, J | 11/01/80 | 05/05/14 | PDF File | ||
| LOCATION OF SEB DRIVE SEXTUPOLES | AD | BNL-104595-2014-TECH | Barge, D | Glenn, J.W. |
09/16/80 | 08/27/14 | PDF File | |
| A study of the sensitivity of an ISABELLE cos? dip ... | AD | BNL-105808-2014-TECH | Bozoki, G | Bunce, G.; Danby, G.; Foelsche, H.; Jackson, J.; K ... |
08/27/80 | 09/16/14 | PDF File | |
| Beam Profile Measurement at A171 Flag | AD | BNL-104004-2014-TECH | Carroll, A | Ewing, B.; Glenn, J.W. |
08/05/80 | 05/05/14 | PDF File | |
| Analysis of the cooldown time of the D bend superc ... | AD | BNL-105807-2014-TECH | Keith, W | Gulotta, G. |
07/10/80 | 09/16/14 | PDF File | |
| AGS WIDE BAND WALL CURRENT MONITOR | AD | BNL-104594-2014-TECH | Ahrens, L | 06/02/80 | 08/27/14 | PDF File | ||
| A time separated p beam | AD | BNL-105805-2014-TECH | Brown, H | 06/02/80 | 09/16/14 | PDF File | ||
| SENSITIVITY REQUIREMENT OF THE HIGH ENERGY POLARIM ... | AD | BNL-104593-2014-TECH | Lee, Y | 05/30/80 | 08/27/14 | PDF File | ||
| DATACON, THE AGS COMPUTER CONTROL SYSTEM | AD | BNL-104592-2014-TECH | Curtiss, J | 05/16/80 | 08/27/14 | PDF File | ||
| EFFECTIVE SPILL LENGTH MONITOR | AD | BNL-104591-2014-TECH | Weisberg, H | 04/14/80 | 08/27/14 | PDF File | ||
| SEC Response | AD | BNL-104003-2014-TECH | Glenn, J | 04/01/80 | 05/05/14 | PDF File | ||
| MULTICHANNEL DISPLAY SYSTEM EXPANSION | AD | BNL-104590-2014-TECH | Frey, W | 03/17/80 | 08/27/14 | PDF File | ||
| FUTURE AGS CONTROL STATIONS | AD | BNL-104589-2014-TECH | Skelly, J | 01/16/80 | 08/27/14 | PDF File | ||
| HEBT STEERING (HEBST) | AD | BNL-104588-2014-TECH | Gill, E | Nasse, S.; Martin, F.; Dabrowski, J. |
01/14/80 | 08/27/14 | PDF File | |
| FEB PERFORMANCE DATA TRANSMISSION | AD | BNL-104587-2014-TECH | Cornish, G | Gabusi, J.; Glenn, J.W.; Warkentien, R. |
12/17/79 | 08/27/14 | PDF File | |
| NOTES ON SPECIAL AGS MAIN RING VACUUM CHAMBERS | AD | BNL-104586-2014-TECH | Jahelka, J | 12/14/79 | 08/27/14 | PDF File | ||
| Longitudinal Phase Space Measurements | AD | BNL-104002-2014-TECH | Ahrens, L | Gill, E.; Raka, E. |
12/13/79 | 05/05/14 | PDF File | |
| AGS VACUUM SEAL GUIDE | AD | BNL-104585-2014-TECH | Jahelka, J | 12/12/79 | 08/27/14 | PDF File | ||
| NORMALIZED SUM/DIFFERENCE MONITOR FOR PICK-UP ELEC ... | AD | BNL-104584-2014-TECH | Preston, R | Ahrens, L.; Gill, E. |
11/08/79 | 08/27/14 | PDF File | |
| SEB EMITTANCE MEASUREMENTS | AD | BNL-104583-2014-TECH | Weisberg, H | 10/17/79 | 08/27/14 | PDF File | ||
| Performance of the C1 Beam | AD | BNL-105804-2014-TECH | Yamin, P | 07/27/79 | 09/16/14 | PDF File | ||
| The ISA detector test facility | AD | BNL-105803-2014-TECH | Yamin, P | 07/20/79 | 09/16/14 | PDF File | ||
| A measurement of the production of low energy pion ... | AD | BNL-105802-2014-TECH | Fox, J | Cohen, R.C.; Sachs, A.M. |
05/11/79 | 09/16/14 | PDF File | |
| H5 BEAM KICKER NOSE BUMP AND COIL POSITION DETERMI ... | AD | BNL-104582-2014-TECH | Cottingham, J | 05/01/79 | 08/27/14 | PDF File | ||
| AGS CABLE TELEVISION SYSTEM (FREY) | AD | BNL-104581-2014-TECH | Frey, W | 04/17/79 | 08/27/14 | PDF File | ||
| Longitudinal Impedance Measurement at 3 BeV/c | AD | BNL-104001-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
04/14/79 | 05/05/14 | PDF File | |
| F5 SEPTUM FAILURE ANALYSIS | AD | BNL-104580-2014-TECH | Cottingham, J | 03/22/79 | 08/27/14 | PDF File | ||
| Electrostatic Splitter Test in the C Line | AD | BNL-103998-2014-TECH | Glenn, J | Weisberg, H. |
03/21/79 | 05/05/14 | PDF File | |
| Analog Sampling Program 2 | AD | BNL-105801-2014-TECH | Stoehr, R | Kovarik, V. |
03/02/79 | 09/16/14 | PDF File | |
| Longitudinal Coupling Impedance Measurements | AD | BNL-104000-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
02/22/79 | 05/05/14 | PDF File | |
| F5 Vertical Aperture Investigation | AD | BNL-103997-2014-TECH | Glenn, J | 02/22/79 | 05/05/14 | PDF File | ||
| Longitudinal Impedance Measurements IX | AD | BNL-103999-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
01/22/79 | 05/05/14 | PDF File | |
| AGS MAIN MAGNET POWER SUPPLY LIMITATIONS OF LONG F ... | AD | BNL-104579-2014-TECH | Cottingham, J | Davis, D.A.; Feltman, A. |
01/22/79 | 08/27/14 | PDF File | |
| Longitudinal Impedance Measurements VIII | AD | BNL-103996-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
12/22/78 | 05/05/14 | PDF File | |
| CONTINUITY OF ELECTRIC POWER AT THE AGS | AD | BNL-104577-2014-TECH | Curtiss, J | 12/14/78 | 08/27/14 | PDF File | ||
| Longitudinal Impedance Measurements VII | AD | BNL-103995-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
11/27/78 | 05/05/14 | PDF File | |
| Analog Sampling Program | AD | BNL-105800-2014-TECH | Kovarik, V | Stoehr, R. |
11/20/78 | 09/16/14 | PDF File | |