Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 4 5 6 7 8 > >> | ||||||||
BOOSTER MAIN MAGNET CYCLE MODELING AND REPEATABILI ... | AD | BNL-105195-2014-TECH | Zhang, S | 10/26/89 | 08/08/14 | PDF File | ||
Booster Parameter List | AD | BNL-105107-2014-TECH | Parsa, Z | 10/01/86 | 08/08/14 | PDF File | ||
Booster Parameter List | AD | BNL-105050-2014-TECH | Parsa, Z | 01/16/86 | 08/08/14 | PDF File | ||
Booster Parameter List | AD | BNL-104657-2014-TECH | Parsa, Z | 01/16/86 | 08/27/14 | PDF File | ||
Booster Parameter List eith Enlarged Q5 | AD | BNL-105072-2014-TECH | Parsa, Z | 04/17/86 | 08/08/14 | PDF File | ||
Booster Parameter List with 1,2,4,7 Sextupole Conf ... | AD | BNL-104665-2014-TECH | Parsa, Z | 02/12/86 | 08/27/14 | PDF File | ||
Booster Parameter List with 40 kV rf Voltage | AD | BNL-104667-2014-TECH | Parsa, Z | 03/10/86 | 08/27/14 | PDF File | ||
Booster Parameter List with 40 Kv RF Voltage | AD | BNL-105067-2014-TECH | Parsa, Z | 03/10/86 | 08/08/14 | PDF File | ||
Booster parameter list with 60 Kv RF voltage and i ... | AD | BNL-105090-2014-TECH | Parsa, Z | 06/18/86 | 08/08/14 | PDF File | ||
Booster parameter list with 90 Kv RF voltage | AD | BNL-105100-2014-TECH | Parsa, Z | 07/17/86 | 08/08/14 | PDF File | ||
BOOSTER POLARITY STANDARDS | AD | BNL-105224-2014-TECH | Bleser, E | 10/30/90 | 08/08/14 | PDF File | ||
Booster proton cavity with voltage reduction durin ... | AD | BNL-105132-2014-TECH | Plotkin, M | 07/29/87 | 08/08/14 | PDF File | ||
Booster RF Program for Heavy Ions | AD | BNL-101673-2014-TECH | Ruggiero, A | Young, G. |
08/22/85 | 01/24/14 | PDF File | |
BOOSTER RING CORRECTION MAGNETS | AD | BNL-105266-2014-TECH | Thern, R | 05/20/94 | 08/08/14 | PDF File | ||
BOOSTER SEXTUPOLE PRODUCTION MEASUREMENTS I | AD | BNL-105226-2014-TECH | Bleser, E | 03/13/91 | 08/08/14 | PDF File | ||
BOOSTER SHORT QUADRUPOLE PRODUCTION MEASUREMENTS | AD | BNL-105218-2014-TECH | Bleser, E | 09/12/90 | 08/08/14 | PDF File | ||
Booster soil, component, and water activation | AD | BNL-105136-2014-TECH | Stevens, A | 09/01/87 | 08/08/14 | PDF File | ||
BOOSTER STOPBAND CORRECTIONS | AD | BNL-105260-2014-TECH | Gardner, C | 01/06/93 | 08/08/14 | PDF File | ||
Booster Studies of Au+15 Losses | AD | BNL-104190-2014-TECH | Blaskiewicz, M | Ahrens, L. |
09/15/94 | 05/20/14 | PDF File | |
Booster survey and linear lattice parameters with ... | AD | BNL-105146-2014-TECH | Parsa, Z | 11/01/87 | 08/08/14 | PDF File | ||
BOOSTER TUNE CONTROL LIMITS AT HIGH FIELD | AD | BNL-105262-2014-TECH | Gardner, C | van Asselt, W. |
02/10/93 | 08/08/14 | PDF File | |
Booster tunnel shielding calculation | AD | BNL-105113-2014-TECH | Gollon, P | 10/24/86 | 08/08/14 | PDF File | ||
Booster vacuum chamber considerations | AD | BNL-105077-2014-TECH | Cottingham, J | 04/30/86 | 08/08/14 | PDF File | ||
Booster Vacuum Measurements for Gold Beam Injectio ... | AD | BNL-104242-2014-TECH | Ahrens, L | Gardner, C.; Zhang, S.Y. |
05/28/98 | 05/20/14 | PDF File | |
Booster Vacuum Requirements Due To Electron Captur ... | AD | BNL-101559-2014-TECH | Young, G | 12/08/83 | 01/24/14 | PDF File | ||
Booster-to-AGS Multiwires and an Evolution of the ... | AD | BNL-99462-2013-TECH | Ahrens, L | 07/01/08 | 01/29/13 | PDF File | ||
Boster pick up electrode signal processing | AD | BNL-105158-2014-TECH | Higgins, E | Stanziani, V. |
03/21/88 | 08/08/14 | PDF File | |
Bounded Approximate Solutions of Linear Systems us ... | AD | BNL-223624-2022-TECH | Brooks, Stephen | 04/08/15 | 10/24/22 | PDF File | ||
BRAHMS shield wall calculations | AD | BNL-101395-2014-TECH | Stevens, A | 10/01/97 | 01/24/14 | PDF File | ||
BRIEF COMMENTS ON TEST RESULTS OF BOTH METAL AND E ... | AD | BNL-104734-2014-TECH | Welch, K | McIntyre, G.T.; Tuozzolo, J.E.; Pate, D.J. |
03/30/89 | 08/27/14 | PDF File | |
BtA Losses 25 June 96 at 8PM | AD | BNL-104221-2014-TECH | Ahrens, L | 06/25/96 | 05/20/14 | PDF File | ||
BTA Magnet Field Map Archive and MAD Model | AD | BNL-99455-2013-TECH | Glenn, J | 04/01/08 | 01/29/13 | PDF File | ||
BTA Stripping Foil Studies | AD | BNL-104783-2014-TECH | Roser, T | 10/02/92 | 08/27/14 | PDF File | ||
Bucket and bunch parameters for clean injection of ... | AD | BNL-207920-2018-TECH | Gardner, Christopher | 07/30/18 | 08/01/18 | PDF File | ||
BUCKET PARAMETERS AND BUNCHING FACTOR FOR DOUBLE R ... | AD | BNL-104794-2014-TECH | Kats, J | 08/04/93 | 08/27/14 | PDF File | ||
Buffer Chemical Polishing and RF Testing of the 56 ... | AD | BNL-99499-2013-TECH | Burrill, A | 01/01/09 | 01/29/13 | PDF File | ||
BUFFER READER MULTIPLEX SYSTEM | AD | BNL-104597-2014-TECH | Dabrowski, J | Gill, E; Naase, S. |
03/04/81 | 08/27/14 | PDF File | |
Bugs in UAL/TEAPOT Map for a Sector Bend | AD | BNL-105641-2014-TECH | Abell, D | 04/04/00 | 09/17/14 | PDF File | ||
Building 919 floor stability | AD | BNL-105849-2014-TECH | Pendzick, A | Karl, F.; Mills, J.; Sullivan, J. |
06/09/89 | 09/16/14 | PDF File | |
Building the RHIC tracking lattice model | AD | BNL-91005-2010-TECH | Luo, Y | Fischer, W.; Tepikian, S. |
01/27/10 | 01/27/10 | PDF File | |
BUMPS IN THE AGS BOOSTER | AD | BNL-105233-2014-TECH | Luccio, A | 03/11/91 | 08/08/14 | PDF File | ||
BUMPS MODELS PRIMER | AD | BNL-104841-2014-TECH | Niederer, J | 02/06/96 | 08/27/14 | PDF File | ||
Bunch length effects in the beam-beam compensation ... | AD | BNL-91114-2010-TECH | Fischer, W | Luo, Y.; Montag, C. |
02/25/10 | 03/01/10 | PDF File | |
Bunch Patterns and Pressure Rise in RHIC | AD | BNL-99270-2013-TECH | Fischer, W | Iriso-Ariz, U. |
10/01/03 | 01/29/13 | PDF File | |
Bunch Profiles in RHIC from CNI Polarimeter Target ... | AD | BNL-99357-2013-TECH | Spinka, H | 05/01/05 | 01/29/13 | PDF File | ||
Bunch Tearing, Initial Observations | AD | BNL-104066-2014-TECH | Ahrens, L | van Asselt, W.; Brown, K.A.; Gill, E.; Glenn, J.W. ... |
08/22/85 | 05/05/14 | PDF File | |
BUNCHED BEAM LONGITUDINAL INSTABILITY-- COHERENT D ... | AD | BNL-104791-2014-TECH | Zhang, S | Weng, W.T. |
04/15/93 | 08/27/14 | PDF File | |
BUNCH-TO-BUNCH TRANSVERSE FEEDBACK FOR THE AGS | AD | BNL-104636-2014-TECH | Raka, E | 10/12/84 | 08/27/14 | PDF File | ||
Burning and Propagation of Flame in Cable Trays at ... | AD | BNL-99560-2013-TECH | Plotkin, M | 12/01/10 | 01/29/13 | PDF File | ||
C SEC Scan and Calibration | AD | BNL-103991-2014-TECH | Soukas, A | Glenn, J.W. |
07/12/78 | 05/05/14 | PDF File | |
C10 amplifier isolated buffer | AD | BNL-105861-2014-TECH | Beadle, E | 03/03/93 | 09/16/14 | PDF File | ||
C10 SEC Preamplifier | AD | BNL-105855-2014-TECH | Beadle, E | 01/21/92 | 09/16/14 | PDF File | ||
CALCULATED FORMULAS FOR CONTROLLING THE AGS CHROMA ... | AD | BNL-104877-2014-TECH | Bleser, E | 04/23/97 | 08/27/14 | PDF File | ||
CALCULATED FORMULAS FOR CONTROLLING THE AGS TUNE | AD | BNL-104880-2014-TECH | Bleser, E | Mussarrafiti, M. |
07/22/97 | 08/27/14 | PDF File | |
Calculated Volume for the RHIC Magnet Enclosure | AD | BNL-101861-2014-TECH | Brown, D | 11/01/94 | 01/24/14 | PDF File | ||
Calculation of Booster power requirements and powe ... | AD | BNL-105101-2014-TECH | Meth, M | 07/17/86 | 08/08/14 | PDF File | ||
Calculation of Booster power requirements based on ... | AD | BNL-105092-2014-TECH | Meth, M | 06/12/86 | 08/08/14 | PDF File | ||
Calculation of Eddy Currents in the Beam Tube | AD | BNL-105052-2014-TECH | Morgan, G | Kahn, S. |
01/28/86 | 08/08/14 | PDF File | |
CALCULATION OF lNCOHERENT SPACE CHARGE TUNE SPREAD ... | AD | BNL-104865-2014-TECH | Zhang, S | Roser, T.; Weng, W.T. |
10/11/96 | 08/27/14 | PDF File | |
Calculation of mechanical and thermal stress in th ... | AD | BNL-98703-2012-TECH | Nayak, S | Yip, K.; Ahrens, L.; Montag, C. |
03/30/12 | 10/23/12 | PDF File | |
CALCULATION OF MOTOR SPEED OF THE SIEMENS M.G. SET ... | AD | BNL-104631-2014-TECH | Feltman, A | 07/31/84 | 08/27/14 | PDF File | ||
Calculation of Oxygen Deficiency Hazard Classes fo ... | AD | BNL-101854-2014-TECH | Iarocci, M | 08/11/94 | 01/24/14 | PDF File | ||
Calculation of Stresses Induced by RHIC Beam on a ... | AD | BNL-101876-2014-TECH | Tsoupas, N | Stevens, A.J.; Rodger, E.S. |
08/01/95 | 01/24/14 | PDF File | |
Calculation of the Booster proton cavity using the ... | AD | BNL-105153-2014-TECH | Zhang, J | 02/02/88 | 08/08/14 | PDF File | ||
Calculation of the invariant spin field by adiabat ... | AD | BNL-103706-2014-TECH | Lehrach, A | Forest, E.; Katayama, T. |
08/01/99 | 08/08/14 | PDF File | |
Calculation of the Mean Energy Loss in the BTA Str ... | AD | BNL-99229-2013-TECH | Ahrens, L | Gardner, C.J. |
07/01/02 | 01/29/13 | PDF File | |
Calculations for the backstop and shielding for th ... | AD | BNL-105724-2014-TECH | Toohig, T | 09/06/67 | 09/16/14 | PDF File | ||
Calculations of the Focusing Properties of a 7% Pa ... | AD | BNL-99286-2013-TECH | Tsoupas, N | 02/01/04 | 01/29/13 | PDF File | ||
Calibration of Booster Extraction Bump Magnet Read ... | AD | BNL-104146-2014-TECH | Ahrens, L | Blaskiewicz, M.; Bleser, E. |
06/02/92 | 05/13/14 | PDF File | |
Calibration of Booster Extraction Bumps | AD | BNL-104154-2014-TECH | Ahrens, L | Bleser, E.; Tanaka, M.; Thern, R. |
03/19/93 | 05/13/14 | PDF File | |
Calibration of IPM Using the Flying Septum | AD | BNL-104148-2014-TECH | Bleser, E | Brown, K.A.; Ingrassia, P.; Kraemer, K.; Laster, J ... |
08/06/92 | 05/13/14 | PDF File | |
Calibration of magneto-resistive probes in A1D5 an ... | AD | BNL-105798-2014-TECH | Brown, H | 04/26/78 | 09/16/14 | PDF File | ||
Calibration of Target SECs Based on Single Beam Tr ... | AD | BNL-104217-2014-TECH | Brown, K | Glenn, J.W. |
05/15/96 | 05/20/14 | PDF File | |
Calibration of the Booster F3 Kicker and Measureme ... | AD | BNL-104160-2014-TECH | Bleser, E | Tanaka, M.; Thern, R. |
03/24/93 | 05/13/14 | PDF File | |
Calibration of the Booster F6 Ejector Septum | AD | BNL-104159-2014-TECH | Tanaka, M | Thern, R.; Zeno, K. |
04/10/93 | 05/13/14 | PDF File | |
Calibration of the ERL cavity FPC and PU couplers | AD | BNL-91259-2010-TECH | Hahn, H | Johnson, E.; Kayran, D. |
04/05/10 | 04/05/10 | PDF File | |
Calibration of the G-10 Loss Monitor | AD | BNL-104234-2014-TECH | Ahrens, L | van Asselt. W. |
07/08/97 | 05/20/14 | PDF File | |
Calibration of the HEBT Steering Dipoles (ND431, N ... | AD | BNL-104060-2014-TECH | Ahrens, L | Gardner, K. |
05/06/85 | 05/05/14 | PDF File | |
Calibration of the internal hall probes in A1D5 & ... | AD | BNL-105799-2014-TECH | Brown, H | 07/26/78 | 09/16/14 | PDF File | ||
CALIBRATION OF THE SECONDARY EMISSION CHAMBERS CE0 ... | AD | BNL-104548-2014-TECH | Agoritsas, V | Balsamo, J.; Witkover, R. |
01/22/76 | 08/27/14 | PDF File | |
Calibration of the Stripped Electron Collector--St ... | AD | BNL-104101-2014-TECH | Ahrens, L | Castillo, V.; Reece, K. |
03/02/87 | 05/13/14 | PDF File | |
Calibration ofÿ Booster Extraction Bump Magnets | AD | BNL-104143-2014-TECH | Ahrens, L | Blaskiewicz, M.; Bleser, E. |
06/03/92 | 05/13/14 | PDF File | |
Camera Assembly design proposal for SRF cavity im ... | AD | BNL-99579-2013-TECH | Tuozzolo, S | 11/01/11 | 01/29/13 | PDF File | ||
Camera assembly design proposal for SRF cavity ima ... | AD | BNL-96411-2011-TECH | Tuozzolo, S | 10/10/11 | 10/10/11 | PDF File | ||
Can YAG screen accept LEReC bunch train? | AD | BNL-112270-2016-TECH | Seletskiy, S | Thieberger, P.; Miller, T. |
05/18/16 | 05/31/16 | PDF File | |
Cancellation of the Chromatic Effects with proper ... | AD | BNL-99299-2013-TECH | Ruggiero, A | 04/01/04 | 01/29/13 | PDF File | ||
Capacitive fundamental power coupler and pickup fo ... | AD | BNL-99464-2013-TECH | Choi, E | Hahn, H. |
07/01/08 | 01/29/13 | PDF File | |
Capture and acceleration on heavy ions | AD | BNL-105103-2014-TECH | Cottingham, J | 07/17/86 | 08/08/14 | PDF File | ||
Capture Efficiency vs. Impedance of RF Cavities | AD | BNL-103924-2014-TECH | Barton, M | Raka, E.; Gill, E. |
11/14/73 | 04/21/14 | PDF File | |
CASIM on VAX | AD | BNL-104705-2014-TECH | Stevens, A | 08/25/87 | 08/27/14 | PDF File | ||
Cathode Ion Bombardment in RF Photoguns | AD | BNL-99471-2013-TECH | Pozdeyev, E | Kayran, D.; Litvinenko, V. |
09/01/08 | 01/29/13 | PDF File | |
CBETA 4-pass orbit correction and tolerance study | AD | BNL-211704-2019-TECH | Lou, William | Peggs, Stephen | 11/29/18 | 05/21/19 | PDF File | |
CBETA Beam position monitor system design and plan ... | AD | BNL-211679-2019-TECH | Michnoff, Robert | Dobbins, J.; Hulsart, R. |
10/02/18 | 05/16/19 | PDF File | |
CBETA Design Report | AD | BNL-114549-2017-TECH | Hoffstaetter, G | Trbojevic, D.; Mayes, c. |
06/08/17 | 11/07/17 | PDF File | |
CBETA Design Report | AD | BNL-114548-2017-TECH | Hoffstaetter, G | Trbojevic, D.; Mayes, C. |
06/08/17 | 11/07/17 | PDF File | |
CBETA Halbach magnet production run | AD | BNL-211701-2019-TECH | Brooks, Stephen | 11/28/18 | 05/21/19 | PDF File | ||
CBETA Technical Report | AD | BNL-211697-2019-TECH | Trbojevic, Dejan | Hoffstaetter, G; Brooks, S; Gulliford, C; Bartnik, ... |
09/27/18 | 05/21/19 | PDF File | |
CBM POLYETHYLENE FOIL CALIBRATION | AD | BNL-104526-2014-TECH | Blumberg, L | Gabusi, J.; Glenn, J.; Levine, G.; Rahm, D. |
04/09/72 | 08/27/14 | PDF File | |
Chaotic Particle Mation in Hadron Storage Rings Ex ... | AD | BNL-102227-2014-TECH | Ficsher, W | Schmidt, F. |
12/18/96 | 01/24/14 | PDF File | |
Check Discrepancy Between Calculated and Expt. Em ... | AD | BNL-103895-2014-TECH | Claus, J | 04/25/73 | 04/21/14 | PDF File |