Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 27 28 29 30 31 > >> | ||||||||
Extract Fraction of Beam at H10, Observe Affect on ... | AD | BNL-103907-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Glasmann, R.; Glenn, ... |
05/10/73 | 04/21/14 | PDF File | |
Horizontal Beam Size at F20 for Entire Accel. Cycl ... | AD | BNL-103904-2014-TECH | Herrera, J | 05/08/73 | 04/21/14 | PDF File | ||
#5 Attempt at H 10 Shaving Extraction. SUCCESS | AD | BNL-103905-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Claus, J.; Curtiss, J ... |
05/08/73 | 04/21/14 | PDF File | |
Affect of Lower B on Capture Efficiency | AD | BNL-103900-2014-TECH | Raka, E | Gill, E. |
05/05/73 | 04/21/14 | PDF File | |
Triple Switch Phase Jump at Transition | AD | BNL-103903-2014-TECH | Raka, E | 05/05/73 | 04/21/14 | PDF File | ||
Beam Distribution Upstream of B Target | AD | BNL-103902-2014-TECH | Bennett, G | Levine, G.; Balsamo, J. |
05/04/73 | 04/21/14 | PDF File | |
Affect of Tuning Various Harmonics of Low Field Di ... | AD | BNL-103901-2014-TECH | Barton, M | 05/02/73 | 04/21/14 | PDF File | ||
Check Emittance Measuring System in Injection Line ... | AD | BNL-103897-2014-TECH | Claus, J | Agoritsas, V.; Blumberg, L.; Carroll, A.; Feltman, ... |
05/01/73 | 04/21/14 | PDF File | |
# 4 Attempt to Extract Beam from H10 | AD | BNL-103898-2014-TECH | Bennett, G | Blumberg, L.; Glasmann, R.; Keane, J.; Raka, E. |
05/01/73 | 04/21/14 | PDF File | |
Check Linearity of Multiplexor Channels in HEBT Em ... | AD | BNL-103899-2014-TECH | Brown, H | 05/01/73 | 04/21/14 | PDF File | ||
MESB Design Notes: II. Mass slit operation and pio ... | AD | BNL-105775-2014-TECH | Murphy, C | 04/30/73 | 09/16/14 | PDF File | ||
#3 Attempt to Extract Beam from H10 | AD | BNL-103896-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Keane, J.; Raka, E.; ... |
04/26/73 | 04/21/14 | PDF File | |
Vertical Beam Size Measurements at J5 | AD | BNL-103894-2014-TECH | Herrera, J | 04/25/73 | 04/21/14 | PDF File | ||
Check Discrepancy Between Calculated and Expt. Em ... | AD | BNL-103895-2014-TECH | Claus, J | 04/25/73 | 04/21/14 | PDF File | ||
Test report of a wire grid electrode in an electr ... | AD | BNL-105774-2014-TECH | Loper, R | 04/25/73 | 09/16/14 | PDF File | ||
# 2 Attempt to Extract Beam from H10 | AD | BNL-103893-2014-TECH | Bagley, G | Bennett, G.W.; Blumber, L.; Soukas, A.; Raka, E. |
04/20/73 | 04/21/14 | PDF File | |
Effect of Cavity Tuning program on Capture Efficie ... | AD | BNL-103892-2014-TECH | Raka, E | 04/18/73 | 04/21/14 | PDF File | ||
Optimization of Stacking by Varying ßH | AD | BNL-103891-2014-TECH | van Steenbergen, A | Brown, H.N.; Claus, J. |
04/17/73 | 04/21/14 | PDF File | |
Hadron Flux Near B Target Using IPDICS | AD | BNL-103890-2014-TECH | Balsamo, J | 04/16/73 | 04/21/14 | PDF File | ||
Vertical Beam Size Measurement at J5 | AD | BNL-103888-2014-TECH | Herrera, J | 04/12/73 | 04/21/14 | PDF File | ||
Coherence Damper Tests | AD | BNL-103889-2014-TECH | Gill, E | Raka, E. |
04/12/73 | 04/21/14 | PDF File | |
Vertical Tune with/without E10 and H10 ?/2 | AD | BNL-103885-2014-TECH | Bennett, G | Blumberg, L.; Gill, E.; Keane, J. |
04/10/73 | 04/21/14 | PDF File | |
Optimization of Stacking Efficiency | AD | BNL-103886-2014-TECH | van Steenbergen, A | Brown, H.N.; Claus, J. |
04/10/73 | 04/21/14 | PDF File | |
Emittance Measurements at 750 keV, 10 MeV and 200 ... | AD | BNL-103887-2014-TECH | Blumberg, L | 04/10/73 | 04/21/14 | PDF File | ||
The energy deposition downstream of target station ... | AD | BNL-105773-2014-TECH | Lee, Y | 04/09/73 | 09/16/14 | PDF File | ||
Low Field Corrections for D.C. F10 Magnet | AD | BNL-103884-2014-TECH | Herrera, J | 04/05/73 | 04/21/14 | PDF File | ||
H10 FEB: Shave Beam and Extract Fraction | AD | BNL-103883-2014-TECH | Bennett, G | Blumberg, L.; Gill, E.; Keane, J.; Soukas, A. |
04/04/73 | 04/21/14 | PDF File | |
Transmission through LEBT and Tank #1 | AD | BNL-103882-2014-TECH | Blumberg, L | 03/31/73 | 04/21/14 | PDF File | ||
MESB Design Notes: I. Tolerances on the uniformity ... | AD | BNL-105772-2014-TECH | Murphy, C | 03/28/73 | 09/16/14 | PDF File | ||
Signal specifications and transceiver operation fo ... | AD | BNL-105771-2014-TECH | Kovarik, V | 03/14/73 | 09/16/14 | PDF File | ||
IMPEDANCE REDUCTION I N THE AGS RF SYSTEM | AD | BNL-104535-2014-TECH | Cottingham, J | 01/23/73 | 08/27/14 | PDF File | ||
BEAM INTENSITY IN THE AGS | AD | BNL-104534-2014-TECH | van Steenbergen, A | 01/20/73 | 08/27/14 | PDF File | ||
CHOICE OF RF CAVITY IMPEDANCES | AD | BNL-104533-2014-TECH | Barton, M | 01/08/73 | 08/27/14 | PDF File | ||
TOLERANCES FOR THE QUADRUPOLES IN LINAC AND HEBT | AD | BNL-104532-2014-TECH | Claus, J | 12/14/72 | 08/27/14 | PDF File | ||
Proposed modifications to beam transport magnet po ... | AD | BNL-105769-2014-TECH | Thornhill, F | Toldo, F. |
11/14/72 | 09/16/14 | PDF File | |
Some observed properties of the low energy separat ... | AD | BNL-105768-2014-TECH | Carroll, A | Kycia, T.F.; Li, K.K.; Michael, D.N.; Mockett, P.M ... |
11/01/72 | 09/16/14 | PDF File | |
SIEMENS POWER SUPPLY MOTOR-GENERATOR SET MOTOR ROT ... | AD | BNL-104531-2014-TECH | Adams, R | Cottingham, J.G.; Davis, D.A.; Gottschalk, R.B. |
09/29/72 | 08/27/14 | PDF File | |
Computer control of the AGS beams | AD | BNL-105770-2014-TECH | Yamamoto, S | 08/30/72 | 09/16/14 | PDF File | ||
DATACOM Serial Transmission System for the PDP-11 | AD | BNL-105764-2014-TECH | Culwick, B | 07/28/72 | 09/16/14 | PDF File | ||
G-10 90ø MONITOR TELESCOPE UPDATE | AD | BNL-104529-2014-TECH | Guthy, J | Glenn, J.; Bennett, G.W. |
07/26/72 | 08/27/14 | PDF File | |
THE NEW BEAM TICKLERS | AD | BNL-104530-2014-TECH | Raka, E | 07/26/72 | 08/27/14 | PDF File | ||
THE E20 WIDE BAND PICK-UP ELECTRODE | AD | BNL-104528-2014-TECH | Raka, E | 06/26/72 | 08/27/14 | PDF File | ||
Datacom interface to magnet power supplies | AD | BNL-105766-2014-TECH | Culwick, B | 06/26/72 | 09/16/14 | PDF File | ||
I/¿ Conflicts for tasks and terminals | AD | BNL-105765-2014-TECH | Culwick, B | Stubblefield, F. |
06/21/72 | 09/16/14 | PDF File | |
A NOTE ON DEUTERON ACCELERATION IN LINAC AND AGS | AD | BNL-104527-2014-TECH | Sluyters, T | 06/08/72 | 08/27/14 | PDF File | ||
PDP 11 - DATACOM interface | AD | BNL-105767-2014-TECH | Culwick, B | 06/03/72 | 09/16/14 | PDF File | ||
Single wire datacom link | AD | BNL-105763-2014-TECH | Kovarik, V | 05/19/72 | 09/16/14 | PDF File | ||
How to play the test beam | AD | BNL-105762-2014-TECH | Blair, T | Lazarus, D.M. |
05/09/72 | 09/16/14 | PDF File | |
A low energy differential Cerenkov Counter | AD | BNL-105761-2014-TECH | Fox, J | 04/13/72 | 09/16/14 | PDF File | ||
CBM POLYETHYLENE FOIL CALIBRATION | AD | BNL-104526-2014-TECH | Blumberg, L | Gabusi, J.; Glenn, J.; Levine, G.; Rahm, D. |
04/09/72 | 08/27/14 | PDF File | |
COMPUTER INTERFACE WITH THE CONVERTED PICK-UP ELEC ... | AD | BNL-104525-2014-TECH | Cottingham, J | 03/28/72 | 08/27/14 | PDF File | ||
Station C single wire control system - device card ... | AD | BNL-105760-2014-TECH | Easler, D | 03/14/72 | 09/16/14 | PDF File | ||
Station C single wire control system - digital/ana ... | AD | BNL-105759-2014-TECH | Easler, D | 03/09/72 | 09/16/14 | PDF File | ||
Beam splitter refrigerator/liquifier test summary ... | AD | BNL-105758-2014-TECH | Gibbs, R | 02/14/72 | 09/16/14 | PDF File | ||
INJECTION PULSE GENERATOR SYSTEM | AD | BNL-104524-2014-TECH | Bagley, G | 02/04/72 | 08/27/14 | PDF File | ||
Measurement of radiative heat input to object near ... | AD | BNL-105757-2014-TECH | Fox, J | 01/28/72 | 09/16/14 | PDF File | ||
BEAM INTENSITY IN THE AGS | AD | BNL-104523-2014-TECH | Herrera, J | 01/20/72 | 08/27/14 | PDF File | ||
G-10 90ø MONITOR TELESCOPE | AD | BNL-104522-2014-TECH | Guthy, J | Bennett, G.W. |
01/14/72 | 08/27/14 | PDF File | |
INFORMAL DATACON SYSTEM REPORT | AD | BNL-104521-2014-TECH | Frankel, R | 12/06/71 | 08/27/14 | PDF File | ||
G-10 Monitoring Systems | AD | BNL-105756-2014-TECH | Lee, Y | Lazarus, D.M. |
12/06/71 | 09/16/14 | PDF File | |
Laser-interaction and laser investigation of phono ... | AD | BNL-105755-2014-TECH | Coy, M | 08/25/71 | 09/16/14 | PDF File | ||
INTERIM REPORT ON CONTROL OF SIEMENS GENERATOR VOL ... | AD | BNL-104520-2014-TECH | Rutan, E | 08/11/71 | 08/27/14 | PDF File | ||
DEUTERON ACCELERATION IN THE AGS | AD | BNL-104519-2014-TECH | Cottingham, J | 08/03/71 | 08/27/14 | PDF File | ||
TESTS OF BRACKET AND COIL INSULATION - MAGNETS A- ... | AD | BNL-104518-2014-TECH | Rutan, E | 06/11/71 | 08/27/14 | PDF File | ||
FRINGING FIELDS FROM THE ELECTROSTATIC SEPTUM | AD | BNL-104517-2014-TECH | Cottingham, J | 04/21/71 | 08/27/14 | PDF File | ||
Modification of medium energy separated beam (MESB ... | AD | BNL-105754-2014-TECH | Fox, J | 12/22/70 | 09/16/14 | PDF File | ||
Gaseous helium utilization for helium bags | AD | BNL-105753-2014-TECH | Thomas, H | 12/10/70 | 09/16/14 | PDF File | ||
TEMPERATURE MEASUREMENT OF TUNGSTEN AND BERYLLIUM ... | AD | BNL-104516-2014-TECH | Repeta, L | Bennett, G.W. |
12/02/70 | 08/27/14 | PDF File | |
DAMAGE REDUCTION IN ELECTROSTATIC SEPTUM ARCS | AD | BNL-104515-2014-TECH | Cottingham, J | 10/07/70 | 08/27/14 | PDF File | ||
INVESTIGATION OF NON-UNIFORM C-RING SEAL COMPRESSI ... | AD | BNL-104514-2014-TECH | Schuchman, J | 09/28/70 | 08/27/14 | PDF File | ||
Field ramping in solid core bending magnets | AD | BNL-105752-2014-TECH | Brown, H | Green, G.K.; Toldo, F. |
09/23/70 | 09/16/14 | PDF File | |
AGS - CENTRAL COMPUTER FACILITY | AD | BNL-104513-2014-TECH | Frankel, R | 09/22/70 | 08/27/14 | PDF File | ||
FAST BACKLEG WINDING SUPPLY DESIGN PARAMETERS | AD | BNL-104512-2014-TECH | Cottingham, J | Tranis, A.; Bagley, G.P. |
09/02/70 | 08/27/14 | PDF File | |
Simple beam splitter for the slow extracted beam | AD | BNL-105751-2014-TECH | Fox, J | 05/12/70 | 09/16/14 | PDF File | ||
COMPUTER CONTROLLED POWER SUPPLIES | AD | BNL-104511-2014-TECH | Frankel, R | 05/01/70 | 08/27/14 | PDF File | ||
Experimental planning and support contribution for ... | AD | BNL-105750-2014-TECH | Berley, D | Walker, W.G. |
04/21/70 | 09/16/14 | PDF File | |
Measurement of duty factor in the slow external be ... | AD | BNL-105749-2014-TECH | Fox, J | 04/20/70 | 09/16/14 | PDF File | ||
VOLTAGE RIPPLE ON SLOW BEAM EXTRACTION EQUIPMENT | AD | BNL-104510-2014-TECH | Cottingham, J | 03/25/70 | 08/27/14 | PDF File | ||
VACUUM SYSTEM FOR THE H-10 EJECTOR MAGNET ASSEMBLY ... | AD | BNL-104509-2014-TECH | Schuchman, J | 03/16/70 | 08/27/14 | PDF File | ||
A SPLITTER SYSTEM FOR THE SLOW EXTRACTED BEAM | AD | BNL-104508-2014-TECH | Grisoli, J | Hsieh, H.C.H. |
03/12/70 | 08/27/14 | PDF File | |
PROPOSAL FOR INCREASING THE LIFETIME OF A SPUTTER- ... | AD | BNL-104507-2014-TECH | Gould, C | 03/03/70 | 08/27/14 | PDF File | ||
G-10 MONITOR TELESCOPE | AD | BNL-104506-2014-TECH | Warkentien, R | Bennett, G.W. |
02/18/70 | 08/27/14 | PDF File | |
Preliminary report on beam 10, the 0¿ charged part ... | AD | BNL-105748-2014-TECH | Detweiler, J | Toohig, T. |
01/13/70 | 09/16/14 | PDF File | |
A PROPOSED PROFILE DETECTOR FOR SLOW EXTERNAL BEAM ... | AD | BNL-104505-2014-TECH | Warkentien, R | Bennett, G.W. |
12/31/69 | 08/27/14 | PDF File | |
FEASIBILITY TEST: FAST BACKLEG BEAM DEFLECTION | AD | BNL-104504-2014-TECH | Cottingham, J | Bagley, G.P. |
12/08/69 | 08/27/14 | PDF File | |
DETERIORATION OF ELECTRICAL INSULATION OF MAIN MAG ... | AD | BNL-104503-2014-TECH | Rutan, E | 11/12/69 | 08/27/14 | PDF File | ||
BEAM OPTICS FOR THE SLOW BEAM EXTENSION | AD | BNL-104502-2014-TECH | Blumberg, L | 10/29/69 | 08/27/14 | PDF File | ||
TARGET TRANSPORT SYSTEM | AD | BNL-104501-2014-TECH | Christianson, C | 09/30/69 | 08/27/14 | PDF File | ||
SIMPLIFIED DESIGN OF LONG LINEAR VACUUM SYSTEMS | AD | BNL-104500-2014-TECH | Schuchman, J | 09/23/69 | 08/27/14 | PDF File | ||
PHASE SPACE ELLIPSES FOR A MODEL AGS | AD | BNL-104499-2014-TECH | Fiske, G | 08/26/69 | 08/27/14 | PDF File | ||
VERTICAL BUMP COIL POWER SYSTEM | AD | BNL-104498-2014-TECH | Cottingham, J | 07/29/69 | 08/27/14 | PDF File | ||
POWER SUPPLY SYSTEM FOR H-10 SEPTUM MAGNET | AD | BNL-104497-2014-TECH | Cottingham, J | Soukas, A.V. |
07/28/69 | 08/27/14 | PDF File | |
ELECTROSTATIC INFLECTOR | AD | BNL-104496-2014-TECH | Repeta, L | Buchanan, V.J. |
07/08/69 | 08/27/14 | PDF File | |
The welding of aluminum buss | AD | BNL-105747-2014-TECH | Kessler, E | 07/02/69 | 09/16/14 | PDF File | ||
A FRONT BITER FOR THE 200 MeV PROTON BEAM: PRELIMI ... | AD | BNL-104495-2014-TECH | Larson, R | 06/20/69 | 08/27/14 | PDF File | ||
Operation and security requirements for the neutra ... | AD | BNL-105746-2014-TECH | Toohig, T | 06/17/69 | 09/16/14 | PDF File | ||
Heat dissipation in a thin window near the focus o ... | AD | BNL-105745-2014-TECH | Toohig, T | 06/03/69 | 09/16/14 | PDF File | ||
Radiation stops in the SEB extension | AD | BNL-105744-2014-TECH | Toohig, T | 05/23/69 | 09/16/14 | PDF File | ||
SOME ERRORS I N GAUGE CALIBRATION | AD | BNL-104494-2014-TECH | Clarke, P | 04/17/69 | 08/27/14 | PDF File | ||
Experimental Division Progress in FY 69 | AD | BNL-105743-2014-TECH | Sanford, J | Walker, W. |
04/04/69 | 09/16/14 | PDF File |