BNL Tech Notes

BNL Tech Notes Search

Department: AD
3016 results found.
Title Dept BNL Number Primary Author BNL Author Other Authors Publication Date Submittal Date
<< < 25 26 27 28 29 > >>
The H5 Kicker Test AD BNL-104009-2014-TECH Weng, W
05/07/81 05/05/14 PDF File
Data plotting and resistance calculation program AD BNL-105811-2014-TECH Ewing, B
04/29/81 09/16/14 PDF File
Costs of running FEB and SEB programs - combined a ... AD BNL-105810-2014-TECH Carroll, A
04/01/81 09/16/14 PDF File
Looping analog data taking programs AD BNL-105809-2014-TECH Stoehr, R
03/13/81 09/16/14 PDF File
BUFFER READER MULTIPLEX SYSTEM AD BNL-104597-2014-TECH Dabrowski, J
Gill, E; Naase, S.
03/04/81 08/27/14 PDF File
MORE SEB EMITTANCE MEASUREMENTS AD BNL-104596-2014-TECH Weisberg, H
02/17/81 08/27/14 PDF File
Spectrum Analysis of LL Noise Under Synchronizatio ... AD BNL-104008-2014-TECH Raka, E
Claus, J.; Cornacchia, M.; Gill, E.; Poole, J.
02/06/81 05/05/14 PDF File
Synchronization of the AGS rf to External Oscillat ... AD BNL-104006-2014-TECH Raka, E
01/30/81 05/05/14 PDF File
SEB Size Comparison AD BNL-104007-2014-TECH Ryan, J
12/10/80 05/05/14 PDF File
SEC Response Continued AD BNL-104005-2014-TECH Glenn, J
11/01/80 05/05/14 PDF File
LOCATION OF SEB DRIVE SEXTUPOLES AD BNL-104595-2014-TECH Barge, D
Glenn, J.W.
09/16/80 08/27/14 PDF File
A study of the sensitivity of an ISABELLE cos? dip ... AD BNL-105808-2014-TECH Bozoki, G
Bunce, G.; Danby, G.; Foelsche, H.; Jackson, J.; K ...
08/27/80 09/16/14 PDF File
Beam Profile Measurement at A171 Flag AD BNL-104004-2014-TECH Carroll, A
Ewing, B.; Glenn, J.W.
08/05/80 05/05/14 PDF File
Analysis of the cooldown time of the D bend superc ... AD BNL-105807-2014-TECH Keith, W
Gulotta, G.
07/10/80 09/16/14 PDF File
AGS WIDE BAND WALL CURRENT MONITOR AD BNL-104594-2014-TECH Ahrens, L
06/02/80 08/27/14 PDF File
A time separated p beam AD BNL-105805-2014-TECH Brown, H
06/02/80 09/16/14 PDF File
SENSITIVITY REQUIREMENT OF THE HIGH ENERGY POLARIM ... AD BNL-104593-2014-TECH Lee, Y
05/30/80 08/27/14 PDF File
DATACON, THE AGS COMPUTER CONTROL SYSTEM AD BNL-104592-2014-TECH Curtiss, J
05/16/80 08/27/14 PDF File
EFFECTIVE SPILL LENGTH MONITOR AD BNL-104591-2014-TECH Weisberg, H
04/14/80 08/27/14 PDF File
SEC Response AD BNL-104003-2014-TECH Glenn, J
04/01/80 05/05/14 PDF File
MULTICHANNEL DISPLAY SYSTEM EXPANSION AD BNL-104590-2014-TECH Frey, W
03/17/80 08/27/14 PDF File
FUTURE AGS CONTROL STATIONS AD BNL-104589-2014-TECH Skelly, J
01/16/80 08/27/14 PDF File
HEBT STEERING (HEBST) AD BNL-104588-2014-TECH Gill, E
Nasse, S.; Martin, F.; Dabrowski, J.
01/14/80 08/27/14 PDF File
FEB PERFORMANCE DATA TRANSMISSION AD BNL-104587-2014-TECH Cornish, G
Gabusi, J.; Glenn, J.W.; Warkentien, R.
12/17/79 08/27/14 PDF File
NOTES ON SPECIAL AGS MAIN RING VACUUM CHAMBERS AD BNL-104586-2014-TECH Jahelka, J
12/14/79 08/27/14 PDF File
Longitudinal Phase Space Measurements AD BNL-104002-2014-TECH Ahrens, L
Gill, E.; Raka, E.
12/13/79 05/05/14 PDF File
AGS VACUUM SEAL GUIDE AD BNL-104585-2014-TECH Jahelka, J
12/12/79 08/27/14 PDF File
NORMALIZED SUM/DIFFERENCE MONITOR FOR PICK-UP ELEC ... AD BNL-104584-2014-TECH Preston, R
Ahrens, L.; Gill, E.
11/08/79 08/27/14 PDF File
SEB EMITTANCE MEASUREMENTS AD BNL-104583-2014-TECH Weisberg, H
10/17/79 08/27/14 PDF File
Performance of the C1 Beam AD BNL-105804-2014-TECH Yamin, P
07/27/79 09/16/14 PDF File
The ISA detector test facility AD BNL-105803-2014-TECH Yamin, P
07/20/79 09/16/14 PDF File
A measurement of the production of low energy pion ... AD BNL-105802-2014-TECH Fox, J
Cohen, R.C.; Sachs, A.M.
05/11/79 09/16/14 PDF File
H5 BEAM KICKER NOSE BUMP AND COIL POSITION DETERMI ... AD BNL-104582-2014-TECH Cottingham, J
05/01/79 08/27/14 PDF File
AGS CABLE TELEVISION SYSTEM (FREY) AD BNL-104581-2014-TECH Frey, W
04/17/79 08/27/14 PDF File
Longitudinal Impedance Measurement at 3 BeV/c AD BNL-104001-2014-TECH Raka, E
Ahrens, L.; Gill, E.
04/14/79 05/05/14 PDF File
F5 SEPTUM FAILURE ANALYSIS AD BNL-104580-2014-TECH Cottingham, J
03/22/79 08/27/14 PDF File
Electrostatic Splitter Test in the C Line AD BNL-103998-2014-TECH Glenn, J
Weisberg, H.
03/21/79 05/05/14 PDF File
Analog Sampling Program 2 AD BNL-105801-2014-TECH Stoehr, R
Kovarik, V.
03/02/79 09/16/14 PDF File
Longitudinal Coupling Impedance Measurements AD BNL-104000-2014-TECH Raka, E
Ahrens, L.; Gill, E.
02/22/79 05/05/14 PDF File
F5 Vertical Aperture Investigation AD BNL-103997-2014-TECH Glenn, J
02/22/79 05/05/14 PDF File
Longitudinal Impedance Measurements IX AD BNL-103999-2014-TECH Raka, E
Ahrens, L.; Gill, E.
01/22/79 05/05/14 PDF File
AGS MAIN MAGNET POWER SUPPLY LIMITATIONS OF LONG F ... AD BNL-104579-2014-TECH Cottingham, J
Davis, D.A.; Feltman, A.
01/22/79 08/27/14 PDF File
Longitudinal Impedance Measurements VIII AD BNL-103996-2014-TECH Raka, E
Ahrens, L.; Gill, E.
12/22/78 05/05/14 PDF File
CONTINUITY OF ELECTRIC POWER AT THE AGS AD BNL-104577-2014-TECH Curtiss, J
12/14/78 08/27/14 PDF File
Longitudinal Impedance Measurements VII AD BNL-103995-2014-TECH Raka, E
Ahrens, L.; Gill, E.
11/27/78 05/05/14 PDF File
Analog Sampling Program AD BNL-105800-2014-TECH Kovarik, V
Stoehr, R.
11/20/78 09/16/14 PDF File
LOW FIELD CORRECTION READBACK EVALUATION AD BNL-104578-2014-TECH Frey, W
11/15/78 08/27/14 PDF File
Longitudinal Impedance Measurement VI AD BNL-103994-2014-TECH Raka, E
Ahrens, L.
10/05/78 05/05/14 PDF File
SEB SPILL SERVO AD BNL-104576-2014-TECH Gabusi, J
Glenn, J.W.; Samadani, R.; Soukas, A.
09/29/78 08/27/14 PDF File
Longitudinal Impedance Measurement V AD BNL-103993-2014-TECH Raka, E
Gill, E.; Ahrens, L.
08/24/78 05/05/14 PDF File
Calibration of the internal hall probes in A1D5 & ... AD BNL-105799-2014-TECH Brown, H
07/26/78 09/16/14 PDF File
Longitudinal Impedance Measurement IV AD BNL-103992-2014-TECH Raka, E
Gill, E.
07/16/78 05/05/14 PDF File
Controlling Beam Dumping AD BNL-103990-2014-TECH Glenn, J
07/12/78 05/05/14 PDF File
C SEC Scan and Calibration AD BNL-103991-2014-TECH Soukas, A
Glenn, J.W.
07/12/78 05/05/14 PDF File
Radial Control of Magnetic Field or a 6.75 GeV/c F ... AD BNL-103989-2014-TECH Raka, E
Gill, E.; Feltman, A.
07/10/78 05/05/14 PDF File
AN EIGHT-CHANNEL HIGH VOLTAGE BIAS SUPPLY AD BNL-104575-2014-TECH Curtiss, J
Klein, J.D.; Witkover, R.
05/09/78 08/27/14 PDF File
Calibration of magneto-resistive probes in A1D5 an ... AD BNL-105798-2014-TECH Brown, H
04/26/78 09/16/14 PDF File
Longitudinal Impedance Measurements III AD BNL-103988-2014-TECH Pedersen, F
Raka, E.; Gill, E.
04/13/78 05/05/14 PDF File
DIBBUK Users Guide R-3 AD BNL-105791-2014-TECH Lowenstein, D
04/12/78 09/16/14 PDF File
Longitudinal Impedance Measurements II AD BNL-103987-2014-TECH Pedersen, F
Raka, E.; Gill, E.
04/06/78 05/05/14 PDF File
Longitudinal Phase Space Studies AD BNL-103986-2014-TECH Raka, E
Gill, E.
03/29/78 05/05/14 PDF File
GAUSS CLOCK CALIBRATION AD BNL-104574-2014-TECH Weisberg, H
03/13/78 08/27/14 PDF File
VIDEO SPLATTER ON VERSATEC HARD COPY AD BNL-104573-2014-TECH Frey, W
02/14/78 08/27/14 PDF File
LEAD PLATED C-RING EVALUATION AD BNL-104572-2014-TECH Jahelka, J
01/27/78 08/27/14 PDF File
AGS INTERNAL TARGETS AD BNL-104571-2014-TECH Gill, E
Nasse, S.; Gabusi, J.
01/24/78 08/27/14 PDF File
Longitudinal Impedance Investigations at 28.5 GeV AD BNL-103985-2014-TECH Pedersen, F
Raka, E.; Gill, E.
12/19/77 05/05/14 PDF File
TESTS OF AN ELECTROSTATIC WIRE SEPTUM MODEL IN THE ... AD BNL-104570-2014-TECH Glenn, J
Weisberg, H.
12/14/77 08/27/14 PDF File
Further Investigation of A-line transport losses AD BNL-103984-2014-TECH Brown, H
Glenn, J.W.
12/02/77 05/05/14 PDF File
Investigation of A-line Transport Losses AD BNL-103982-2014-TECH Glenn, J
10/27/77 05/05/14 PDF File
Injection Matching and Dilution Studies AD BNL-103980-2014-TECH LeMaire, J
Raka, E.
10/20/77 04/21/14 PDF File
Linac Emittance and Momentum Spread Variation with ... AD BNL-103983-2014-TECH Witkover, R
Fewell, N.
10/20/77 05/05/14 PDF File
Fast Repetition Rate of AGS AD BNL-103979-2014-TECH Weng, W
Gill, E.
10/19/77 04/21/14 PDF File
Beam steering AD BNL-103981-2014-TECH Brown, H
Glenn, J.W.
10/17/77 04/21/14 PDF File
Extraction Efficiency AD BNL-103978-2014-TECH Glenn, J
Weisberg, H.
10/14/77 04/21/14 PDF File
Control of rf Verniers During Phaseback and Flat T ... AD BNL-103977-2014-TECH Gill, E
Glenn, J.W.; Weisberg, H.
10/06/77 04/21/14 PDF File
Vertical Phase Space Dilution Studies at Injection ... AD BNL-103976-2014-TECH Raka, E
LeMaire, J.-L.
09/28/77 04/21/14 PDF File
Injection Studies (Sources of Vertical Dilution) AD BNL-103975-2014-TECH Raka, E
LeMaire, J.-L.
09/22/77 04/21/14 PDF File
POTENTIOMETERS FOR POSITION READOUT AD BNL-104569-2014-TECH Curtiss, J
09/20/77 08/27/14 PDF File
1.5 GeV/c MTX FEB AD BNL-103974-2014-TECH Egelman, E
Gill, E.; LoSecco, J.M.; Sulak, L.R.; Weng, W.T.; ...
09/12/77 04/21/14 PDF File
Vertical Injection Matching Studies AD BNL-103973-2014-TECH Raka, E
LeMaire, J.-L.
09/09/77 04/21/14 PDF File
MAXIMUM SPEED OF MECHANICAL DEVICES IN A DIGITAL C ... AD BNL-104568-2014-TECH Curtiss, J
09/02/77 08/27/14 PDF File
Vertical Injection Matching Studies AD BNL-103971-2014-TECH Raka, E
LeMaire, J.-L.; Gill, E.
08/31/77 04/21/14 PDF File
STRIPCHART AGS PERFORMANCE MONITOR AD BNL-104567-2014-TECH Poulton, K
Gill, E.; Naase, S.; Glenn, J.W.
08/24/77 08/27/14 PDF File
1.5 GeV/c MTX FEB AD BNL-103970-2014-TECH Blumberg, L
Egelman, E,; Gill, E.; LoSecco, J.M.; Soukas, A.; ...
08/16/77 04/21/14 PDF File
Vertical Beam Size and Emittance at Low and High I ... AD BNL-103972-2014-TECH Raka, E
08/08/77 04/21/14 PDF File
PROPOSAL TO ELIMINATE PARASITIC HARMONICS IN THE A ... AD BNL-104566-2014-TECH Guidee, P
07/28/77 08/27/14 PDF File
1.5 GeV/c FEB Extrac. and Emitt. AD BNL-103969-2014-TECH Blumberg, L
Cahill, W.; Egelman, E.; Eld, C.B..; Gill, E.; Gab ...
07/26/77 04/21/14 PDF File
5 GeV/c Slow Spill for Expt. 703 AD BNL-103968-2014-TECH Carroll, A
Glenn, J.W.; Soukas, A.
07/21/77 04/21/14 PDF File
Extract 1.5 GeV/c FEB to U-186 Beam Stop at maximu ... AD BNL-103967-2014-TECH Blumberg, L
Cahill, W.; Egelman, E.; Elliott, E.K.; LoSecco, J ...
07/01/77 04/21/14 PDF File
MEASUREMENTS OF HIGH ENERGY PROTON FLUXES USING FO ... AD BNL-104564-2014-TECH Agoritsas, V
06/29/77 08/27/14 PDF File
EVALUATION TESTS OF TWO SPECIAL SECONDARY EMISSION ... AD BNL-104565-2014-TECH Agoritsas, V
06/28/77 08/27/14 PDF File
5 GeV/c low intensity slow spill for Experiment 70 ... AD BNL-103966-2014-TECH Carroll, A
Glenn, J.W.; Soukas, A.; Witkover, R.
06/23/77 04/21/14 PDF File
AGS CABLE TELEVISION SYSTEM AD BNL-104563-2014-TECH Sanders, R
05/20/77 08/27/14 PDF File
1.5 GeV/c FEB extraction and transport AD BNL-103965-2014-TECH Blumberg, L
Gabusi, J.; Gill, E.; LoSecco, J.M.; Soukas, A.; S ...
05/09/77 04/21/14 PDF File
STUDIES OF SLOW BEAM EXTRACTION WITH AND WITHOUT A ... AD BNL-104562-2014-TECH Glenn, J
Weisberg, H.
05/06/77 08/27/14 PDF File
1.5 GeV/c multi-turn FEB extraction at maximum int ... AD BNL-103964-2014-TECH Blumberg, L
Gabusi, J.; Glenn, J.W.; LoSecco, J.M.; Soukas, A. ...
04/23/77 04/21/14 PDF File
Linac beam bunching at 2.5 MHz (ring rf frequency) ... AD BNL-103963-2014-TECH Fewell, N
04/21/77 04/21/14 PDF File
AN IMPROVED F10 SWITCHYARD DESIGN AD BNL-104561-2014-TECH Weisberg, H
04/21/77 08/27/14 PDF File
DIBBUK Users Guide R-2 AD BNL-105790-2014-TECH Lowenstein, D
04/12/77 09/16/14 PDF File
OPTION FOR IMPROVING THE SLOW EXTRACTED BEAM AD BNL-104560-2014-TECH Weisberg, H
03/18/77 08/27/14 PDF File