Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 27 28 29 30 31 > | ||||||||
INTERIM REPORT ON CONTROL OF SIEMENS GENERATOR VOL ... | AD | BNL-104520-2014-TECH | Rutan, E | 08/11/71 | 08/27/14 | PDF File | ||
DEUTERON ACCELERATION IN THE AGS | AD | BNL-104519-2014-TECH | Cottingham, J | 08/03/71 | 08/27/14 | PDF File | ||
TESTS OF BRACKET AND COIL INSULATION - MAGNETS A- ... | AD | BNL-104518-2014-TECH | Rutan, E | 06/11/71 | 08/27/14 | PDF File | ||
FRINGING FIELDS FROM THE ELECTROSTATIC SEPTUM | AD | BNL-104517-2014-TECH | Cottingham, J | 04/21/71 | 08/27/14 | PDF File | ||
Modification of medium energy separated beam (MESB ... | AD | BNL-105754-2014-TECH | Fox, J | 12/22/70 | 09/16/14 | PDF File | ||
Gaseous helium utilization for helium bags | AD | BNL-105753-2014-TECH | Thomas, H | 12/10/70 | 09/16/14 | PDF File | ||
TEMPERATURE MEASUREMENT OF TUNGSTEN AND BERYLLIUM ... | AD | BNL-104516-2014-TECH | Repeta, L | Bennett, G.W. |
12/02/70 | 08/27/14 | PDF File | |
DAMAGE REDUCTION IN ELECTROSTATIC SEPTUM ARCS | AD | BNL-104515-2014-TECH | Cottingham, J | 10/07/70 | 08/27/14 | PDF File | ||
INVESTIGATION OF NON-UNIFORM C-RING SEAL COMPRESSI ... | AD | BNL-104514-2014-TECH | Schuchman, J | 09/28/70 | 08/27/14 | PDF File | ||
Field ramping in solid core bending magnets | AD | BNL-105752-2014-TECH | Brown, H | Green, G.K.; Toldo, F. |
09/23/70 | 09/16/14 | PDF File | |
AGS - CENTRAL COMPUTER FACILITY | AD | BNL-104513-2014-TECH | Frankel, R | 09/22/70 | 08/27/14 | PDF File | ||
FAST BACKLEG WINDING SUPPLY DESIGN PARAMETERS | AD | BNL-104512-2014-TECH | Cottingham, J | Tranis, A.; Bagley, G.P. |
09/02/70 | 08/27/14 | PDF File | |
Simple beam splitter for the slow extracted beam | AD | BNL-105751-2014-TECH | Fox, J | 05/12/70 | 09/16/14 | PDF File | ||
COMPUTER CONTROLLED POWER SUPPLIES | AD | BNL-104511-2014-TECH | Frankel, R | 05/01/70 | 08/27/14 | PDF File | ||
Experimental planning and support contribution for ... | AD | BNL-105750-2014-TECH | Berley, D | Walker, W.G. |
04/21/70 | 09/16/14 | PDF File | |
Measurement of duty factor in the slow external be ... | AD | BNL-105749-2014-TECH | Fox, J | 04/20/70 | 09/16/14 | PDF File | ||
VOLTAGE RIPPLE ON SLOW BEAM EXTRACTION EQUIPMENT | AD | BNL-104510-2014-TECH | Cottingham, J | 03/25/70 | 08/27/14 | PDF File | ||
VACUUM SYSTEM FOR THE H-10 EJECTOR MAGNET ASSEMBLY ... | AD | BNL-104509-2014-TECH | Schuchman, J | 03/16/70 | 08/27/14 | PDF File | ||
A SPLITTER SYSTEM FOR THE SLOW EXTRACTED BEAM | AD | BNL-104508-2014-TECH | Grisoli, J | Hsieh, H.C.H. |
03/12/70 | 08/27/14 | PDF File | |
PROPOSAL FOR INCREASING THE LIFETIME OF A SPUTTER- ... | AD | BNL-104507-2014-TECH | Gould, C | 03/03/70 | 08/27/14 | PDF File | ||
G-10 MONITOR TELESCOPE | AD | BNL-104506-2014-TECH | Warkentien, R | Bennett, G.W. |
02/18/70 | 08/27/14 | PDF File | |
Preliminary report on beam 10, the 0¿ charged part ... | AD | BNL-105748-2014-TECH | Detweiler, J | Toohig, T. |
01/13/70 | 09/16/14 | PDF File | |
A PROPOSED PROFILE DETECTOR FOR SLOW EXTERNAL BEAM ... | AD | BNL-104505-2014-TECH | Warkentien, R | Bennett, G.W. |
12/31/69 | 08/27/14 | PDF File | |
FEASIBILITY TEST: FAST BACKLEG BEAM DEFLECTION | AD | BNL-104504-2014-TECH | Cottingham, J | Bagley, G.P. |
12/08/69 | 08/27/14 | PDF File | |
DETERIORATION OF ELECTRICAL INSULATION OF MAIN MAG ... | AD | BNL-104503-2014-TECH | Rutan, E | 11/12/69 | 08/27/14 | PDF File | ||
BEAM OPTICS FOR THE SLOW BEAM EXTENSION | AD | BNL-104502-2014-TECH | Blumberg, L | 10/29/69 | 08/27/14 | PDF File | ||
TARGET TRANSPORT SYSTEM | AD | BNL-104501-2014-TECH | Christianson, C | 09/30/69 | 08/27/14 | PDF File | ||
SIMPLIFIED DESIGN OF LONG LINEAR VACUUM SYSTEMS | AD | BNL-104500-2014-TECH | Schuchman, J | 09/23/69 | 08/27/14 | PDF File | ||
PHASE SPACE ELLIPSES FOR A MODEL AGS | AD | BNL-104499-2014-TECH | Fiske, G | 08/26/69 | 08/27/14 | PDF File | ||
VERTICAL BUMP COIL POWER SYSTEM | AD | BNL-104498-2014-TECH | Cottingham, J | 07/29/69 | 08/27/14 | PDF File | ||
POWER SUPPLY SYSTEM FOR H-10 SEPTUM MAGNET | AD | BNL-104497-2014-TECH | Cottingham, J | Soukas, A.V. |
07/28/69 | 08/27/14 | PDF File | |
ELECTROSTATIC INFLECTOR | AD | BNL-104496-2014-TECH | Repeta, L | Buchanan, V.J. |
07/08/69 | 08/27/14 | PDF File | |
The welding of aluminum buss | AD | BNL-105747-2014-TECH | Kessler, E | 07/02/69 | 09/16/14 | PDF File | ||
A FRONT BITER FOR THE 200 MeV PROTON BEAM: PRELIMI ... | AD | BNL-104495-2014-TECH | Larson, R | 06/20/69 | 08/27/14 | PDF File | ||
Operation and security requirements for the neutra ... | AD | BNL-105746-2014-TECH | Toohig, T | 06/17/69 | 09/16/14 | PDF File | ||
Heat dissipation in a thin window near the focus o ... | AD | BNL-105745-2014-TECH | Toohig, T | 06/03/69 | 09/16/14 | PDF File | ||
Radiation stops in the SEB extension | AD | BNL-105744-2014-TECH | Toohig, T | 05/23/69 | 09/16/14 | PDF File | ||
SOME ERRORS I N GAUGE CALIBRATION | AD | BNL-104494-2014-TECH | Clarke, P | 04/17/69 | 08/27/14 | PDF File | ||
Experimental Division Progress in FY 69 | AD | BNL-105743-2014-TECH | Sanford, J | Walker, W. |
04/04/69 | 09/16/14 | PDF File | |
Possibility of obtaining secondary alpha beams at ... | AD | BNL-105742-2014-TECH | Wang, C | 03/11/69 | 09/16/14 | PDF File | ||
AGS lattice corrections and tuning | AD | BNL-105741-2014-TECH | Danby, G | Jackson, J.W.; Raka, E.C. |
02/25/69 | 09/16/14 | PDF File | |
D.C. beam separator electrode sheets stud fastenin ... | AD | BNL-105740-2014-TECH | Walker, J | 02/13/69 | 09/16/14 | PDF File | ||
FAST-SLOW EXTRACTION AT F10 INDUCED BY THE FAST KI ... | AD | BNL-104493-2014-TECH | Blumberg, L | Soukas, A.V. |
01/20/69 | 08/27/14 | PDF File | |
An overview of particle flux models for 2000 GeV s ... | AD | BNL-105739-2014-TECH | Toohig, T | 12/26/68 | 09/16/14 | PDF File | ||
G10 Be0 ceramic target, its location, and related ... | AD | BNL-105738-2014-TECH | Tanguay, G | 12/16/68 | 09/16/14 | PDF File | ||
INVESTIGATION OF A HIGH VOLTAGE BREAKDOWN PROBLEM ... | AD | BNL-104492-2014-TECH | Sluyters, T | 12/10/68 | 08/27/14 | PDF File | ||
STATUS OF THE NEW FAST KICKER DESIGN | AD | BNL-104491-2014-TECH | Fruitman, M | 12/09/68 | 08/27/14 | PDF File | ||
Recent improvements in the performancce of the ele ... | AD | BNL-105737-2014-TECH | Loper, R | 12/03/68 | 09/16/14 | PDF File | ||
AN ISOLATION CIRCUIT FOR CONTROL ROOM POWER SUPPLI ... | AD | BNL-104490-2014-TECH | Vogel, U | 10/31/68 | 08/27/14 | PDF File | ||
Design of an 800 MeV/c separated beam II | AD | BNL-105736-2014-TECH | Fox, J | 10/14/68 | 09/16/14 | PDF File | ||
DESIGN OF A VACUUM SYSTEM FOR SPARE DUOPLASMATRON ... | AD | BNL-104489-2014-TECH | Clarke, P | 10/08/68 | 08/27/14 | PDF File | ||
A DUOPLASMATRON WITH OSCILLATING EECTRONS | AD | BNL-104488-2014-TECH | Sluyters, T | 09/27/68 | 08/27/14 | PDF File | ||
Production of muons by proton scraping in the slow ... | AD | BNL-105735-2014-TECH | Fox, J | 09/12/68 | 09/16/14 | PDF File | ||
Design of three bending magnets for use with beam ... | AD | BNL-105734-2014-TECH | Filler, L | 08/26/68 | 09/16/14 | PDF File | ||
A schematic outline of the extension of the SEB in ... | AD | BNL-105733-2014-TECH | Toohig, T | 07/11/68 | 09/16/14 | PDF File | ||
SLOW EXTERNAL BEAM SEPTUM AND EJECTOR ASSEMBLIES | AD | BNL-104487-2014-TECH | Pallas, F | 06/26/68 | 08/27/14 | PDF File | ||
Beam sharing compatiblity between internal and ext ... | AD | BNL-105732-2014-TECH | Toohig, T | 06/26/68 | 09/16/14 | PDF File | ||
Experimental planning and support - CY 67 | AD | BNL-105731-2014-TECH | Sanford, J | 06/17/68 | 09/16/14 | PDF File | ||
On secondary particle production from an EPB targe ... | AD | BNL-105730-2014-TECH | Toohig, T | 06/13/68 | 09/16/14 | PDF File | ||
REMANENT FIELDS AND THEIR LONGITUDINAL AXIS IN AGS ... | AD | BNL-104486-2014-TECH | Vogel, U | 05/17/68 | 08/27/14 | PDF File | ||
NOTES ON EXTRACTED BEAMS | AD | BNL-104485-2014-TECH | Forsyth, E | Grisoli, J.J. |
04/23/68 | 08/27/14 | PDF File | |
A possible muon channel at the AGS and its relevan ... | AD | BNL-105729-2014-TECH | Toohig, T | 04/18/68 | 09/16/14 | PDF File | ||
EXPERIMENTER TIMING AND INTENSITY INFORMATION | AD | BNL-104483-2014-TECH | Watts, A | 04/16/68 | 08/27/14 | PDF File | ||
AERO VAC AVA-1 RESIDUAL GAS ANALYZER OPERATING PRO ... | AD | BNL-104484-2014-TECH | Schuchman, J | 04/15/68 | 08/27/14 | PDF File | ||
Comparative testing of NIM Discriminators EG&G-TR2 ... | AD | BNL-105728-2014-TECH | Redmond, L | Huebsch, W.R. |
04/05/68 | 09/16/14 | PDF File | |
DESIGN OF THE NEW FAST KICKER | AD | BNL-104482-2014-TECH | Fruitman, M | Forsyth, E.B. |
03/28/68 | 08/27/14 | PDF File | |
CONSTRUCTION AND TESTING OF THE HIGH GRADIENT ACCE ... | AD | BNL-104480-2014-TECH | Amari, R | 03/20/68 | 08/27/14 | PDF File | ||
METAL C-RING VACUUM SEALS FOR AGS | AD | BNL-104481-2014-TECH | Schuchman, J | 03/18/68 | 08/27/14 | PDF File | ||
MAGNETIC INFLECTOR FOR 200 MeV INJECTION,. | AD | BNL-104479-2014-TECH | Hsieh, H | 02/08/68 | 08/27/14 | PDF File | ||
BACKLEG WINDINGS | AD | BNL-104478-2014-TECH | Pallas, F | 01/31/68 | 08/27/14 | PDF File | ||
Post-conversion research facilities | AD | BNL-105727-2014-TECH | Sanford, J | 01/17/68 | 09/16/14 | PDF File | ||
EPOXY BONDING TESTS FOR THE HIGH GRADIENT ACCELERA ... | AD | BNL-104477-2014-TECH | Senator, S | 01/08/68 | 08/27/14 | PDF File | ||
QUARTERLY STATUS REPORT (10) PREINJECTOR GROUP | AD | BNL-104476-2014-TECH | Sluyters, T | 01/02/68 | 08/27/14 | PDF File | ||
AGS substations | AD | BNL-105726-2014-TECH | Sullivan, J | 12/04/67 | 09/16/14 | PDF File | ||
SENSITIVITY COMPARISON OF HELIUM LEAK DETECTOR VS ... | AD | BNL-104475-2014-TECH | Schuchman, J | 11/15/67 | 08/27/14 | PDF File | ||
The beam dump in the slow external proton beam (SE ... | AD | BNL-105725-2014-TECH | Toohig, T | 10/30/67 | 09/16/14 | PDF File | ||
Calculations for the backstop and shielding for th ... | AD | BNL-105724-2014-TECH | Toohig, T | 09/06/67 | 09/16/14 | PDF File | ||
Design of an 800 MeV/c separated beam to be operat ... | AD | BNL-105723-2014-TECH | Fox, J | 07/19/67 | 09/16/14 | PDF File | ||
SHORT COLUMN PROGRESS (9) | AD | BNL-104474-2014-TECH | Sluyters, T | 07/06/67 | 08/27/14 | PDF File | ||
Description and use of separated beam 1a to the 31 ... | AD | BNL-105722-2014-TECH | Brown, H | 06/20/67 | 09/16/14 | PDF File | ||
2-3 GeV/c particle beams from the G-10 4.7¿ beam a ... | AD | BNL-105720-2014-TECH | Read, A | Rubinstein, R. |
05/18/67 | 09/16/14 | PDF File | |
G-10 Target | AD | BNL-105721-2014-TECH | Sanford, J | 05/18/67 | 09/16/14 | PDF File | ||
Empirical formulas for particle production in P-Be ... | AD | BNL-105715-2014-TECH | Sanford, J | Wang, C.L. |
05/01/67 | 09/16/14 | PDF File | |
Technical Program in FY 66 | AD | BNL-105719-2014-TECH | Sanford, J | 04/12/67 | 09/16/14 | PDF File | ||
Shorter separators for beam 3 | AD | BNL-105717-2014-TECH | Foelsche, H | 03/27/67 | 09/16/14 | PDF File | ||
METAL VACUUM SEALS FOR THE AGS | AD | BNL-104473-2014-TECH | Schuchman, J | 03/23/67 | 08/27/14 | PDF File | ||
The G-10 = 4.7¿ pion beam (4-16 GeV/c) at the Broo ... | AD | BNL-105718-2014-TECH | Read, A | 03/10/67 | 09/16/14 | PDF File | ||
Empirical formulas for particle production in P-Be ... | AD | BNL-105714-2014-TECH | Sanford, J | Wang, C.L. |
03/01/67 | 09/16/14 | PDF File | |
AGS OPERATIONS -SUMMARY FOR 1966 | AD | BNL-104472-2014-TECH | Adams, R | 02/15/67 | 08/27/14 | PDF File | ||
AGS VACUUM SEALS | AD | BNL-104471-2014-TECH | Schuchman, J | 02/02/67 | 08/27/14 | PDF File | ||
NEWTRAP, A PDP-8 MONITOR, DEBUGGING PROGRAM | AD | BNL-104470-2014-TECH | Stewart, C | 01/24/67 | 08/27/14 | PDF File | ||
Empirical formula for inclusive proton spectra bet ... | AD | BNL-105716-2014-TECH | Wang, C | 01/01/67 | 09/16/14 | PDF File | ||
PROGRESS REPORT (7) CONCERNING SHORT COLUMN | AD | BNL-104469-2014-TECH | Sluyters, T | 12/28/66 | 08/27/14 | PDF File | ||
LO-LOAD METAL SEALS | AD | BNL-104468-2014-TECH | Schuchman, J | 10/20/66 | 08/27/14 | PDF File | ||
METAL SEALS FOR THE 1/2 SUPERPERIOD PUMPING MOCK-U ... | AD | BNL-104467-2014-TECH | Schuchman, J | 10/10/66 | 08/27/14 | PDF File | ||
0-VAL METAL SEALS (Del Mfg.Co) | AD | BNL-104465-2014-TECH | Schuchman, J | 08/23/66 | 08/27/14 | PDF File | ||
THE NEXT FAST KICKER | AD | BNL-104464-2014-TECH | Forsyth, E | 07/25/66 | 08/27/14 | PDF File | ||
BEAM MEASUREMENT WITH THE FAST KICKER | AD | BNL-104463-2014-TECH | Watts, A | 06/16/66 | 08/27/14 | PDF File | ||
TRIP REPORT - CALIFORNIA June 6-11, 1966 | AD | BNL-104462-2014-TECH | Schuchman, J | 06/14/66 | 08/27/14 | PDF File | ||
SHORT COLUMN PROGRESS REPORT | AD | BNL-104460-2014-TECH | Sluyters, T | 04/18/66 | 08/27/14 | PDF File |