| Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
|---|---|---|---|---|---|---|---|---|
| << < 27 28 29 30 31 > >> | ||||||||
| Test New Instrumentation in Linac and HEBT | AD | BNL-103945-2014-TECH | Batchelor, K | Sheehan, J.; Witkover, R.; Fewell, N.; Lankshear, ... |
07/16/74 | 04/21/14 | PDF File | |
| Measure Linear Coupling at 2, 14, 26 and 28.5 GeV/ ... | AD | BNL-103944-2014-TECH | Raka, E | Month, M. |
07/12/74 | 04/21/14 | PDF File | |
| MAINTENANCE - OPERATING INSTRUCTIONS FAST BACKLEG ... | AD | BNL-104542-2014-TECH | Bagley, G | 07/11/74 | 08/27/14 | PDF File | ||
| Steering and Tuning with new Optics in LEBT | AD | BNL-103943-2014-TECH | van Steenbergen, A | Batchelor, K.; Fewell, N. |
07/01/74 | 04/21/14 | PDF File | |
| Progress during FY 1974 | AD | BNL-105783-2014-TECH | Walker, W | 06/19/74 | 09/16/14 | PDF File | ||
| STRIPPING OF H- IN A MAGNETIC FIELD | AD | BNL-104541-2014-TECH | Prelec, K | 06/04/74 | 08/27/14 | PDF File | ||
| Beam Capture in High Voltage (150 KV peak) mode. ... | AD | BNL-103942-2014-TECH | Raka, E | 05/10/74 | 04/21/14 | PDF File | ||
| Beam Stacking to Restore Early CBM to 1.8 1013 | AD | BNL-103941-2014-TECH | van Steenbergen, A | Claus, J.; Herrera, J. |
05/09/74 | 04/21/14 | PDF File | |
| I10 Magnet Position vs. Early CBM. I10 Extraction | AD | BNL-103940-2014-TECH | Keane, J | Cornish, G. |
05/08/74 | 04/21/14 | PDF File | |
| Beam Tuning to Maximize Accelerated Beam | AD | BNL-103939-2014-TECH | Raka, E | Gill, E.; Herrera, J. |
04/16/74 | 04/21/14 | PDF File | |
| Synchronization of MG set Frequency with Line | AD | BNL-103938-2014-TECH | Cottingham, J | Gottschalk, R.; Feltman, A. |
04/08/74 | 04/21/14 | PDF File | |
| E15 Kicker for 9H Measurement. Bunch Shape Osc. | AD | BNL-103936-2014-TECH | Raka, E | 04/04/74 | 04/21/14 | PDF File | ||
| Use of the multi-purpose transformer units | AD | BNL-105781-2014-TECH | Thornhill, F | 04/02/74 | 09/16/14 | PDF File | ||
| Horizontal Beam Size Measurement at F20 | AD | BNL-103937-2014-TECH | Herrera, J | 04/01/74 | 04/21/14 | PDF File | ||
| Transition Losses vs. Beam Intensity | AD | BNL-103935-2014-TECH | Raka, E | 03/15/74 | 04/21/14 | PDF File | ||
| Vertical Beam Size at J19 vs. Time in Cycle | AD | BNL-103934-2014-TECH | Herrera, J | 03/09/74 | 04/21/14 | PDF File | ||
| Activate Triple Switch at Transition | AD | BNL-103933-2014-TECH | Raka, E | 03/05/74 | 04/21/14 | PDF File | ||
| Computer control of secondary beams | AD | BNL-105782-2014-TECH | Lowenstein, D | 03/01/74 | 09/16/14 | PDF File | ||
| LESB Secondary Intensity vs. C.Target Material | AD | BNL-103932-2014-TECH | Glenn, J | Smith, S. |
02/28/74 | 04/21/14 | PDF File | |
| Intensity vs. RF Gap Voltage on J-Station | AD | BNL-103931-2014-TECH | Raka, E | 02/20/74 | 04/21/14 | PDF File | ||
| LINAC HIGH VOLTAGE CABLE ASSEMBLY | AD | BNL-104540-2014-TECH | Damm, R | 01/31/74 | 08/27/14 | PDF File | ||
| Low Field Tuning. Effect of Shorting 8 RF Cavitie ... | AD | BNL-103930-2014-TECH | Raka, E | Gill, E. |
01/24/74 | 04/21/14 | PDF File | |
| FEB Instrumentation Tests | AD | BNL-103929-2014-TECH | Bennett, G | 01/23/74 | 04/21/14 | PDF File | ||
| Beam Tuning with low Field Corrections | AD | BNL-103928-2014-TECH | Herrera, J | Barton, M.Q. |
01/14/74 | 04/21/14 | PDF File | |
| Intensity vs. Operating point (?H, ?H) at Injectio ... | AD | BNL-103927-2014-TECH | Barton, M | Claus, J.; Gill, E.; Herrera, J. |
12/04/73 | 04/21/14 | PDF File | |
| Tune measurements using computer fit to perturbed ... | AD | BNL-103926-2014-TECH | Barton, M | 12/01/73 | 04/21/14 | PDF File | ||
| Injection Capture vs. B | AD | BNL-103925-2014-TECH | Herrera, J | Raka, E. |
11/20/73 | 04/21/14 | PDF File | |
| Capture Efficiency vs. Impedance of RF Cavities | AD | BNL-103924-2014-TECH | Barton, M | Raka, E.; Gill, E. |
11/14/73 | 04/21/14 | PDF File | |
| Single and Multiturn Stacking Efficiency | AD | BNL-103923-2014-TECH | van Steenbergen, A | 10/24/73 | 04/21/14 | PDF File | ||
| Measure Aperture on 28.5 GeV/c Flattop | AD | BNL-103922-2014-TECH | Gill, E | Raka, E. |
10/06/73 | 04/21/14 | PDF File | |
| Continue Check of Linac and HEBT Parameters | AD | BNL-103920-2014-TECH | Claus, J | Herrera, J.; Gill, E.; Raka, E.; van Steenbergen, ... |
10/03/73 | 04/21/14 | PDF File | |
| Measure FEB Extraction Efficiency, Calibrate Trans ... | AD | BNL-103921-2014-TECH | Balsamo, J | Bennett, G.W.; Blumberg, L.; Glasmann, R.; Guthy, ... |
10/03/73 | 04/21/14 | PDF File | |
| Test 30 GeV/c FEB Extraction | AD | BNL-103919-2014-TECH | Bennett, G | 10/03/73 | 04/21/14 | PDF File | ||
| Reproducibility of linac and HEBT Parameters | AD | BNL-103918-2014-TECH | van Steenbergen, A | Claus, J.; Fewell, N.; Gill, E.; Sheehan, J.F. |
09/26/73 | 04/21/14 | PDF File | |
| Extract FEB up to 8 Bend Point | AD | BNL-103917-2014-TECH | Bennett, G | Blumberg, L.; Casey, W.R.; Culwick, B.B.; Glasmann ... |
09/12/73 | 04/21/14 | PDF File | |
| Repeat of 5/2/73 Study of Low Field Orbit Harmonic ... | AD | BNL-103916-2014-TECH | Barton, M | 09/05/73 | 04/21/14 | PDF File | ||
| ACCELERATION OF HEAVY IONS IN THE AGS | AD | BNL-104539-2014-TECH | Prelec, K | 09/05/73 | 08/27/14 | PDF File | ||
| Linear Coupling on Flattop. Beam-induced Signal o ... | AD | BNL-103915-2014-TECH | Raka, E | 09/04/73 | 04/21/14 | PDF File | ||
| Tune AGS | AD | BNL-103914-2014-TECH | Raka, E | Gill, E.; Herrera, J. |
08/29/73 | 04/21/14 | PDF File | |
| Positional stability of the EEBA floor and of a lo ... | AD | BNL-105779-2014-TECH | Willis, W | 08/22/73 | 09/16/14 | PDF File | ||
| Ideas for a new low energy separated beam | AD | BNL-105780-2014-TECH | Willis, W | 08/22/73 | 09/16/14 | PDF File | ||
| Extract 9 x 1012 Beam Into Test Channel-H10 pos.vs ... | AD | BNL-103913-2014-TECH | Blumberg, L | Glasmann, R.; Guthy, J.; Keane, J.; Raka, E. |
08/21/73 | 04/21/14 | PDF File | |
| Set up of FEB Power Supply Amplitudes, Timing, Pol ... | AD | BNL-103912-2014-TECH | Blumberg, L | Keane, J. |
08/15/73 | 04/21/14 | PDF File | |
| Some more observed properties of the low energy se ... | AD | BNL-105777-2014-TECH | Carroll, A | Chiang, I-H.; Kycia, T.F.; Li, K.K.; Mazur, P.O.; ... |
07/01/73 | 09/16/14 | PDF File | |
| Computer control in AGS experimental area | AD | BNL-105776-2014-TECH | Loper, R | 06/26/73 | 09/16/14 | PDF File | ||
| HEBT Emittance programs: LINEM and EMIT | AD | BNL-105778-2014-TECH | Brown, H | 06/21/73 | 09/16/14 | PDF File | ||
| POSSIBLE INJECTION LINES FOR H- INJECTION | AD | BNL-104538-2014-TECH | Barton, M | 06/20/73 | 08/27/14 | PDF File | ||
| Intensity of Early and Late CBM vs. Multi-turn Int ... | AD | BNL-103911-2014-TECH | Herrera, J | 06/15/73 | 04/21/14 | PDF File | ||
| DESCRIPTION OF THE SLOW EXTRACTED BEAM SECURITY SY ... | AD | BNL-104537-2014-TECH | McGeary, A | 06/15/73 | 08/27/14 | PDF File | ||
| CS INJECTION INTO A DUOPLASMATRON | AD | BNL-104536-2014-TECH | Lawrence, G | Hayward, T.; Prelec, K.; Sluyters, Th. |
06/06/73 | 08/27/14 | PDF File | |
| Horizontal Emittance at High Intensity, try I10 Ex ... | AD | BNL-103910-2014-TECH | Bennett, G | Blumberg, L.; Glasmann, R.; Guthy, J.; Keane, J.; ... |
05/25/73 | 04/21/14 | PDF File | |
| Measure Horizontal profiles of FEB in Test Beam | AD | BNL-103909-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/16/73 | 04/21/14 | PDF File | |
| Measure Vertical Emittance of FEB in Test Beam | AD | BNL-103908-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/14/73 | 04/21/14 | PDF File | |
| Optimize H10 Magnet Position, Test Instrumentation ... | AD | BNL-103906-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/10/73 | 04/21/14 | PDF File | |
| Extract Fraction of Beam at H10, Observe Affect on ... | AD | BNL-103907-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Glasmann, R.; Glenn, ... |
05/10/73 | 04/21/14 | PDF File | |
| Horizontal Beam Size at F20 for Entire Accel. Cycl ... | AD | BNL-103904-2014-TECH | Herrera, J | 05/08/73 | 04/21/14 | PDF File | ||
| #5 Attempt at H 10 Shaving Extraction. SUCCESS | AD | BNL-103905-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Claus, J.; Curtiss, J ... |
05/08/73 | 04/21/14 | PDF File | |
| Affect of Lower B on Capture Efficiency | AD | BNL-103900-2014-TECH | Raka, E | Gill, E. |
05/05/73 | 04/21/14 | PDF File | |
| Triple Switch Phase Jump at Transition | AD | BNL-103903-2014-TECH | Raka, E | 05/05/73 | 04/21/14 | PDF File | ||
| Beam Distribution Upstream of B Target | AD | BNL-103902-2014-TECH | Bennett, G | Levine, G.; Balsamo, J. |
05/04/73 | 04/21/14 | PDF File | |
| Affect of Tuning Various Harmonics of Low Field Di ... | AD | BNL-103901-2014-TECH | Barton, M | 05/02/73 | 04/21/14 | PDF File | ||
| Check Emittance Measuring System in Injection Line ... | AD | BNL-103897-2014-TECH | Claus, J | Agoritsas, V.; Blumberg, L.; Carroll, A.; Feltman, ... |
05/01/73 | 04/21/14 | PDF File | |
| # 4 Attempt to Extract Beam from H10 | AD | BNL-103898-2014-TECH | Bennett, G | Blumberg, L.; Glasmann, R.; Keane, J.; Raka, E. |
05/01/73 | 04/21/14 | PDF File | |
| Check Linearity of Multiplexor Channels in HEBT Em ... | AD | BNL-103899-2014-TECH | Brown, H | 05/01/73 | 04/21/14 | PDF File | ||
| MESB Design Notes: II. Mass slit operation and pio ... | AD | BNL-105775-2014-TECH | Murphy, C | 04/30/73 | 09/16/14 | PDF File | ||
| #3 Attempt to Extract Beam from H10 | AD | BNL-103896-2014-TECH | Bagley, G | Bennett, G.W.; Blumberg, L.; Keane, J.; Raka, E.; ... |
04/26/73 | 04/21/14 | PDF File | |
| Vertical Beam Size Measurements at J5 | AD | BNL-103894-2014-TECH | Herrera, J | 04/25/73 | 04/21/14 | PDF File | ||
| Check Discrepancy Between Calculated and Expt. Em ... | AD | BNL-103895-2014-TECH | Claus, J | 04/25/73 | 04/21/14 | PDF File | ||
| Test report of a wire grid electrode in an electr ... | AD | BNL-105774-2014-TECH | Loper, R | 04/25/73 | 09/16/14 | PDF File | ||
| # 2 Attempt to Extract Beam from H10 | AD | BNL-103893-2014-TECH | Bagley, G | Bennett, G.W.; Blumber, L.; Soukas, A.; Raka, E. |
04/20/73 | 04/21/14 | PDF File | |
| Effect of Cavity Tuning program on Capture Efficie ... | AD | BNL-103892-2014-TECH | Raka, E | 04/18/73 | 04/21/14 | PDF File | ||
| Optimization of Stacking by Varying ßH | AD | BNL-103891-2014-TECH | van Steenbergen, A | Brown, H.N.; Claus, J. |
04/17/73 | 04/21/14 | PDF File | |
| Hadron Flux Near B Target Using IPDICS | AD | BNL-103890-2014-TECH | Balsamo, J | 04/16/73 | 04/21/14 | PDF File | ||
| Vertical Beam Size Measurement at J5 | AD | BNL-103888-2014-TECH | Herrera, J | 04/12/73 | 04/21/14 | PDF File | ||
| Coherence Damper Tests | AD | BNL-103889-2014-TECH | Gill, E | Raka, E. |
04/12/73 | 04/21/14 | PDF File | |
| Vertical Tune with/without E10 and H10 ?/2 | AD | BNL-103885-2014-TECH | Bennett, G | Blumberg, L.; Gill, E.; Keane, J. |
04/10/73 | 04/21/14 | PDF File | |
| Optimization of Stacking Efficiency | AD | BNL-103886-2014-TECH | van Steenbergen, A | Brown, H.N.; Claus, J. |
04/10/73 | 04/21/14 | PDF File | |
| Emittance Measurements at 750 keV, 10 MeV and 200 ... | AD | BNL-103887-2014-TECH | Blumberg, L | 04/10/73 | 04/21/14 | PDF File | ||
| The energy deposition downstream of target station ... | AD | BNL-105773-2014-TECH | Lee, Y | 04/09/73 | 09/16/14 | PDF File | ||
| Low Field Corrections for D.C. F10 Magnet | AD | BNL-103884-2014-TECH | Herrera, J | 04/05/73 | 04/21/14 | PDF File | ||
| H10 FEB: Shave Beam and Extract Fraction | AD | BNL-103883-2014-TECH | Bennett, G | Blumberg, L.; Gill, E.; Keane, J.; Soukas, A. |
04/04/73 | 04/21/14 | PDF File | |
| Transmission through LEBT and Tank #1 | AD | BNL-103882-2014-TECH | Blumberg, L | 03/31/73 | 04/21/14 | PDF File | ||
| MESB Design Notes: I. Tolerances on the uniformity ... | AD | BNL-105772-2014-TECH | Murphy, C | 03/28/73 | 09/16/14 | PDF File | ||
| Signal specifications and transceiver operation fo ... | AD | BNL-105771-2014-TECH | Kovarik, V | 03/14/73 | 09/16/14 | PDF File | ||
| IMPEDANCE REDUCTION I N THE AGS RF SYSTEM | AD | BNL-104535-2014-TECH | Cottingham, J | 01/23/73 | 08/27/14 | PDF File | ||
| BEAM INTENSITY IN THE AGS | AD | BNL-104534-2014-TECH | van Steenbergen, A | 01/20/73 | 08/27/14 | PDF File | ||
| CHOICE OF RF CAVITY IMPEDANCES | AD | BNL-104533-2014-TECH | Barton, M | 01/08/73 | 08/27/14 | PDF File | ||
| TOLERANCES FOR THE QUADRUPOLES IN LINAC AND HEBT | AD | BNL-104532-2014-TECH | Claus, J | 12/14/72 | 08/27/14 | PDF File | ||
| Proposed modifications to beam transport magnet po ... | AD | BNL-105769-2014-TECH | Thornhill, F | Toldo, F. |
11/14/72 | 09/16/14 | PDF File | |
| Some observed properties of the low energy separat ... | AD | BNL-105768-2014-TECH | Carroll, A | Kycia, T.F.; Li, K.K.; Michael, D.N.; Mockett, P.M ... |
11/01/72 | 09/16/14 | PDF File | |
| SIEMENS POWER SUPPLY MOTOR-GENERATOR SET MOTOR ROT ... | AD | BNL-104531-2014-TECH | Adams, R | Cottingham, J.G.; Davis, D.A.; Gottschalk, R.B. |
09/29/72 | 08/27/14 | PDF File | |
| Computer control of the AGS beams | AD | BNL-105770-2014-TECH | Yamamoto, S | 08/30/72 | 09/16/14 | PDF File | ||
| DATACOM Serial Transmission System for the PDP-11 | AD | BNL-105764-2014-TECH | Culwick, B | 07/28/72 | 09/16/14 | PDF File | ||
| G-10 90ø MONITOR TELESCOPE UPDATE | AD | BNL-104529-2014-TECH | Guthy, J | Glenn, J.; Bennett, G.W. |
07/26/72 | 08/27/14 | PDF File | |
| THE NEW BEAM TICKLERS | AD | BNL-104530-2014-TECH | Raka, E | 07/26/72 | 08/27/14 | PDF File | ||
| THE E20 WIDE BAND PICK-UP ELECTRODE | AD | BNL-104528-2014-TECH | Raka, E | 06/26/72 | 08/27/14 | PDF File | ||
| Datacom interface to magnet power supplies | AD | BNL-105766-2014-TECH | Culwick, B | 06/26/72 | 09/16/14 | PDF File | ||
| I/¿ Conflicts for tasks and terminals | AD | BNL-105765-2014-TECH | Culwick, B | Stubblefield, F. |
06/21/72 | 09/16/14 | PDF File | |
| A NOTE ON DEUTERON ACCELERATION IN LINAC AND AGS | AD | BNL-104527-2014-TECH | Sluyters, T | 06/08/72 | 08/27/14 | PDF File | ||
| PDP 11 - DATACOM interface | AD | BNL-105767-2014-TECH | Culwick, B | 06/03/72 | 09/16/14 | PDF File | ||