BNL Tech Notes

BNL Tech Notes Search

Department: AD
3015 results found.
Title Dept BNL Number Primary Author BNL Author Other Authors Publication Date Submittal Date
<< < 27 28 29 30 31 >
DAMAGE REDUCTION IN ELECTROSTATIC SEPTUM ARCS AD BNL-104515-2014-TECH Cottingham, J
10/07/70 08/27/14 PDF File
INVESTIGATION OF NON-UNIFORM C-RING SEAL COMPRESSI ... AD BNL-104514-2014-TECH Schuchman, J
09/28/70 08/27/14 PDF File
Field ramping in solid core bending magnets AD BNL-105752-2014-TECH Brown, H
Green, G.K.; Toldo, F.
09/23/70 09/16/14 PDF File
AGS - CENTRAL COMPUTER FACILITY AD BNL-104513-2014-TECH Frankel, R
09/22/70 08/27/14 PDF File
FAST BACKLEG WINDING SUPPLY DESIGN PARAMETERS AD BNL-104512-2014-TECH Cottingham, J
Tranis, A.; Bagley, G.P.
09/02/70 08/27/14 PDF File
Simple beam splitter for the slow extracted beam AD BNL-105751-2014-TECH Fox, J
05/12/70 09/16/14 PDF File
COMPUTER CONTROLLED POWER SUPPLIES AD BNL-104511-2014-TECH Frankel, R
05/01/70 08/27/14 PDF File
Experimental planning and support contribution for ... AD BNL-105750-2014-TECH Berley, D
Walker, W.G.
04/21/70 09/16/14 PDF File
Measurement of duty factor in the slow external be ... AD BNL-105749-2014-TECH Fox, J
04/20/70 09/16/14 PDF File
VOLTAGE RIPPLE ON SLOW BEAM EXTRACTION EQUIPMENT AD BNL-104510-2014-TECH Cottingham, J
03/25/70 08/27/14 PDF File
VACUUM SYSTEM FOR THE H-10 EJECTOR MAGNET ASSEMBLY ... AD BNL-104509-2014-TECH Schuchman, J
03/16/70 08/27/14 PDF File
A SPLITTER SYSTEM FOR THE SLOW EXTRACTED BEAM AD BNL-104508-2014-TECH Grisoli, J
Hsieh, H.C.H.
03/12/70 08/27/14 PDF File
PROPOSAL FOR INCREASING THE LIFETIME OF A SPUTTER- ... AD BNL-104507-2014-TECH Gould, C
03/03/70 08/27/14 PDF File
G-10 MONITOR TELESCOPE AD BNL-104506-2014-TECH Warkentien, R
Bennett, G.W.
02/18/70 08/27/14 PDF File
Preliminary report on beam 10, the 0¿ charged part ... AD BNL-105748-2014-TECH Detweiler, J
Toohig, T.
01/13/70 09/16/14 PDF File
A PROPOSED PROFILE DETECTOR FOR SLOW EXTERNAL BEAM ... AD BNL-104505-2014-TECH Warkentien, R
Bennett, G.W.
12/31/69 08/27/14 PDF File
FEASIBILITY TEST: FAST BACKLEG BEAM DEFLECTION AD BNL-104504-2014-TECH Cottingham, J
Bagley, G.P.
12/08/69 08/27/14 PDF File
DETERIORATION OF ELECTRICAL INSULATION OF MAIN MAG ... AD BNL-104503-2014-TECH Rutan, E
11/12/69 08/27/14 PDF File
BEAM OPTICS FOR THE SLOW BEAM EXTENSION AD BNL-104502-2014-TECH Blumberg, L
10/29/69 08/27/14 PDF File
TARGET TRANSPORT SYSTEM AD BNL-104501-2014-TECH Christianson, C
09/30/69 08/27/14 PDF File
SIMPLIFIED DESIGN OF LONG LINEAR VACUUM SYSTEMS AD BNL-104500-2014-TECH Schuchman, J
09/23/69 08/27/14 PDF File
PHASE SPACE ELLIPSES FOR A MODEL AGS AD BNL-104499-2014-TECH Fiske, G
08/26/69 08/27/14 PDF File
VERTICAL BUMP COIL POWER SYSTEM AD BNL-104498-2014-TECH Cottingham, J
07/29/69 08/27/14 PDF File
POWER SUPPLY SYSTEM FOR H-10 SEPTUM MAGNET AD BNL-104497-2014-TECH Cottingham, J
Soukas, A.V.
07/28/69 08/27/14 PDF File
ELECTROSTATIC INFLECTOR AD BNL-104496-2014-TECH Repeta, L
Buchanan, V.J.
07/08/69 08/27/14 PDF File
The welding of aluminum buss AD BNL-105747-2014-TECH Kessler, E
07/02/69 09/16/14 PDF File
A FRONT BITER FOR THE 200 MeV PROTON BEAM: PRELIMI ... AD BNL-104495-2014-TECH Larson, R
06/20/69 08/27/14 PDF File
Operation and security requirements for the neutra ... AD BNL-105746-2014-TECH Toohig, T
06/17/69 09/16/14 PDF File
Heat dissipation in a thin window near the focus o ... AD BNL-105745-2014-TECH Toohig, T
06/03/69 09/16/14 PDF File
Radiation stops in the SEB extension AD BNL-105744-2014-TECH Toohig, T
05/23/69 09/16/14 PDF File
SOME ERRORS I N GAUGE CALIBRATION AD BNL-104494-2014-TECH Clarke, P
04/17/69 08/27/14 PDF File
Experimental Division Progress in FY 69 AD BNL-105743-2014-TECH Sanford, J
Walker, W.
04/04/69 09/16/14 PDF File
Possibility of obtaining secondary alpha beams at ... AD BNL-105742-2014-TECH Wang, C
03/11/69 09/16/14 PDF File
AGS lattice corrections and tuning AD BNL-105741-2014-TECH Danby, G
Jackson, J.W.; Raka, E.C.
02/25/69 09/16/14 PDF File
D.C. beam separator electrode sheets stud fastenin ... AD BNL-105740-2014-TECH Walker, J
02/13/69 09/16/14 PDF File
FAST-SLOW EXTRACTION AT F10 INDUCED BY THE FAST KI ... AD BNL-104493-2014-TECH Blumberg, L
Soukas, A.V.
01/20/69 08/27/14 PDF File
An overview of particle flux models for 2000 GeV s ... AD BNL-105739-2014-TECH Toohig, T
12/26/68 09/16/14 PDF File
G10 Be0 ceramic target, its location, and related ... AD BNL-105738-2014-TECH Tanguay, G
12/16/68 09/16/14 PDF File
INVESTIGATION OF A HIGH VOLTAGE BREAKDOWN PROBLEM ... AD BNL-104492-2014-TECH Sluyters, T
12/10/68 08/27/14 PDF File
STATUS OF THE NEW FAST KICKER DESIGN AD BNL-104491-2014-TECH Fruitman, M
12/09/68 08/27/14 PDF File
Recent improvements in the performancce of the ele ... AD BNL-105737-2014-TECH Loper, R
12/03/68 09/16/14 PDF File
AN ISOLATION CIRCUIT FOR CONTROL ROOM POWER SUPPLI ... AD BNL-104490-2014-TECH Vogel, U
10/31/68 08/27/14 PDF File
Design of an 800 MeV/c separated beam II AD BNL-105736-2014-TECH Fox, J
10/14/68 09/16/14 PDF File
DESIGN OF A VACUUM SYSTEM FOR SPARE DUOPLASMATRON ... AD BNL-104489-2014-TECH Clarke, P
10/08/68 08/27/14 PDF File
A DUOPLASMATRON WITH OSCILLATING EECTRONS AD BNL-104488-2014-TECH Sluyters, T
09/27/68 08/27/14 PDF File
Production of muons by proton scraping in the slow ... AD BNL-105735-2014-TECH Fox, J
09/12/68 09/16/14 PDF File
Design of three bending magnets for use with beam ... AD BNL-105734-2014-TECH Filler, L
08/26/68 09/16/14 PDF File
A schematic outline of the extension of the SEB in ... AD BNL-105733-2014-TECH Toohig, T
07/11/68 09/16/14 PDF File
SLOW EXTERNAL BEAM SEPTUM AND EJECTOR ASSEMBLIES AD BNL-104487-2014-TECH Pallas, F
06/26/68 08/27/14 PDF File
Beam sharing compatiblity between internal and ext ... AD BNL-105732-2014-TECH Toohig, T
06/26/68 09/16/14 PDF File
Experimental planning and support - CY 67 AD BNL-105731-2014-TECH Sanford, J
06/17/68 09/16/14 PDF File
On secondary particle production from an EPB targe ... AD BNL-105730-2014-TECH Toohig, T
06/13/68 09/16/14 PDF File
REMANENT FIELDS AND THEIR LONGITUDINAL AXIS IN AGS ... AD BNL-104486-2014-TECH Vogel, U
05/17/68 08/27/14 PDF File
NOTES ON EXTRACTED BEAMS AD BNL-104485-2014-TECH Forsyth, E
Grisoli, J.J.
04/23/68 08/27/14 PDF File
A possible muon channel at the AGS and its relevan ... AD BNL-105729-2014-TECH Toohig, T
04/18/68 09/16/14 PDF File
EXPERIMENTER TIMING AND INTENSITY INFORMATION AD BNL-104483-2014-TECH Watts, A
04/16/68 08/27/14 PDF File
AERO VAC AVA-1 RESIDUAL GAS ANALYZER OPERATING PRO ... AD BNL-104484-2014-TECH Schuchman, J
04/15/68 08/27/14 PDF File
Comparative testing of NIM Discriminators EG&G-TR2 ... AD BNL-105728-2014-TECH Redmond, L
Huebsch, W.R.
04/05/68 09/16/14 PDF File
DESIGN OF THE NEW FAST KICKER AD BNL-104482-2014-TECH Fruitman, M
Forsyth, E.B.
03/28/68 08/27/14 PDF File
CONSTRUCTION AND TESTING OF THE HIGH GRADIENT ACCE ... AD BNL-104480-2014-TECH Amari, R
03/20/68 08/27/14 PDF File
METAL C-RING VACUUM SEALS FOR AGS AD BNL-104481-2014-TECH Schuchman, J
03/18/68 08/27/14 PDF File
MAGNETIC INFLECTOR FOR 200 MeV INJECTION,. AD BNL-104479-2014-TECH Hsieh, H
02/08/68 08/27/14 PDF File
BACKLEG WINDINGS AD BNL-104478-2014-TECH Pallas, F
01/31/68 08/27/14 PDF File
Post-conversion research facilities AD BNL-105727-2014-TECH Sanford, J
01/17/68 09/16/14 PDF File
EPOXY BONDING TESTS FOR THE HIGH GRADIENT ACCELERA ... AD BNL-104477-2014-TECH Senator, S
01/08/68 08/27/14 PDF File
QUARTERLY STATUS REPORT (10) PREINJECTOR GROUP AD BNL-104476-2014-TECH Sluyters, T
01/02/68 08/27/14 PDF File
AGS substations AD BNL-105726-2014-TECH Sullivan, J
12/04/67 09/16/14 PDF File
SENSITIVITY COMPARISON OF HELIUM LEAK DETECTOR VS ... AD BNL-104475-2014-TECH Schuchman, J
11/15/67 08/27/14 PDF File
The beam dump in the slow external proton beam (SE ... AD BNL-105725-2014-TECH Toohig, T
10/30/67 09/16/14 PDF File
Calculations for the backstop and shielding for th ... AD BNL-105724-2014-TECH Toohig, T
09/06/67 09/16/14 PDF File
Design of an 800 MeV/c separated beam to be operat ... AD BNL-105723-2014-TECH Fox, J
07/19/67 09/16/14 PDF File
SHORT COLUMN PROGRESS (9) AD BNL-104474-2014-TECH Sluyters, T
07/06/67 08/27/14 PDF File
Description and use of separated beam 1a to the 31 ... AD BNL-105722-2014-TECH Brown, H
06/20/67 09/16/14 PDF File
2-3 GeV/c particle beams from the G-10 4.7¿ beam a ... AD BNL-105720-2014-TECH Read, A
Rubinstein, R.
05/18/67 09/16/14 PDF File
G-10 Target AD BNL-105721-2014-TECH Sanford, J
05/18/67 09/16/14 PDF File
Empirical formulas for particle production in P-Be ... AD BNL-105715-2014-TECH Sanford, J
Wang, C.L.
05/01/67 09/16/14 PDF File
Technical Program in FY 66 AD BNL-105719-2014-TECH Sanford, J
04/12/67 09/16/14 PDF File
Shorter separators for beam 3 AD BNL-105717-2014-TECH Foelsche, H
03/27/67 09/16/14 PDF File
METAL VACUUM SEALS FOR THE AGS AD BNL-104473-2014-TECH Schuchman, J
03/23/67 08/27/14 PDF File
The G-10 = 4.7¿ pion beam (4-16 GeV/c) at the Broo ... AD BNL-105718-2014-TECH Read, A
03/10/67 09/16/14 PDF File
Empirical formulas for particle production in P-Be ... AD BNL-105714-2014-TECH Sanford, J
Wang, C.L.
03/01/67 09/16/14 PDF File
AGS OPERATIONS -SUMMARY FOR 1966 AD BNL-104472-2014-TECH Adams, R
02/15/67 08/27/14 PDF File
AGS VACUUM SEALS AD BNL-104471-2014-TECH Schuchman, J
02/02/67 08/27/14 PDF File
NEWTRAP, A PDP-8 MONITOR, DEBUGGING PROGRAM AD BNL-104470-2014-TECH Stewart, C
01/24/67 08/27/14 PDF File
Empirical formula for inclusive proton spectra bet ... AD BNL-105716-2014-TECH Wang, C
01/01/67 09/16/14 PDF File
PROGRESS REPORT (7) CONCERNING SHORT COLUMN AD BNL-104469-2014-TECH Sluyters, T
12/28/66 08/27/14 PDF File
LO-LOAD METAL SEALS AD BNL-104468-2014-TECH Schuchman, J
10/20/66 08/27/14 PDF File
METAL SEALS FOR THE 1/2 SUPERPERIOD PUMPING MOCK-U ... AD BNL-104467-2014-TECH Schuchman, J
10/10/66 08/27/14 PDF File
0-VAL METAL SEALS (Del Mfg.Co) AD BNL-104465-2014-TECH Schuchman, J
08/23/66 08/27/14 PDF File
THE NEXT FAST KICKER AD BNL-104464-2014-TECH Forsyth, E
07/25/66 08/27/14 PDF File
BEAM MEASUREMENT WITH THE FAST KICKER AD BNL-104463-2014-TECH Watts, A
06/16/66 08/27/14 PDF File
TRIP REPORT - CALIFORNIA June 6-11, 1966 AD BNL-104462-2014-TECH Schuchman, J
06/14/66 08/27/14 PDF File
SHORT COLUMN PROGRESS REPORT AD BNL-104460-2014-TECH Sluyters, T
04/18/66 08/27/14 PDF File
SUPPRESSION OF VERTICAL COHERENCE IN THE AGS AD BNL-104461-2014-TECH Raka, E
04/18/66 08/27/14 PDF File
SOME ADDITIONAL EMITTANCE RESULTS WITH THE MARK II ... AD BNL-104459-2014-TECH Wroe, H
03/30/66 08/27/14 PDF File
DETAILS OF THE OXIDE CATHODES USED IN THE AGS DUOP ... AD BNL-104458-2014-TECH Wroe, H
03/29/66 08/27/14 PDF File
A METHOD OF INTERCHANGING HORIZONTAL AND VERTICAL ... AD BNL-104457-2014-TECH Maschke, A
03/25/66 08/27/14 PDF File
REPORT ON TRIP TO CAMBRIDGE ELECTRON ACCELERATOR AD BNL-104453-2014-TECH Schuchman, J
03/18/66 08/27/14 PDF File
AGS OPERATIONS SUMMARY FOR 1965 AD BNL-104456-2014-TECH Adams, R
03/11/66 08/27/14 PDF File
MULTITURN EXTRACTION FROM AN AGS AD BNL-104455-2014-TECH Maschke, A
03/08/66 08/27/14 PDF File