Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 26 27 28 29 30 > >> | ||||||||
GAUSS CLOCK CALIBRATION | AD | BNL-104574-2014-TECH | Weisberg, H | 03/13/78 | 08/27/14 | PDF File | ||
VIDEO SPLATTER ON VERSATEC HARD COPY | AD | BNL-104573-2014-TECH | Frey, W | 02/14/78 | 08/27/14 | PDF File | ||
LEAD PLATED C-RING EVALUATION | AD | BNL-104572-2014-TECH | Jahelka, J | 01/27/78 | 08/27/14 | PDF File | ||
AGS INTERNAL TARGETS | AD | BNL-104571-2014-TECH | Gill, E | Nasse, S.; Gabusi, J. |
01/24/78 | 08/27/14 | PDF File | |
Longitudinal Impedance Investigations at 28.5 GeV | AD | BNL-103985-2014-TECH | Pedersen, F | Raka, E.; Gill, E. |
12/19/77 | 05/05/14 | PDF File | |
TESTS OF AN ELECTROSTATIC WIRE SEPTUM MODEL IN THE ... | AD | BNL-104570-2014-TECH | Glenn, J | Weisberg, H. |
12/14/77 | 08/27/14 | PDF File | |
Further Investigation of A-line transport losses | AD | BNL-103984-2014-TECH | Brown, H | Glenn, J.W. |
12/02/77 | 05/05/14 | PDF File | |
Investigation of A-line Transport Losses | AD | BNL-103982-2014-TECH | Glenn, J | 10/27/77 | 05/05/14 | PDF File | ||
Injection Matching and Dilution Studies | AD | BNL-103980-2014-TECH | LeMaire, J | Raka, E. |
10/20/77 | 04/21/14 | PDF File | |
Linac Emittance and Momentum Spread Variation with ... | AD | BNL-103983-2014-TECH | Witkover, R | Fewell, N. |
10/20/77 | 05/05/14 | PDF File | |
Fast Repetition Rate of AGS | AD | BNL-103979-2014-TECH | Weng, W | Gill, E. |
10/19/77 | 04/21/14 | PDF File | |
Beam steering | AD | BNL-103981-2014-TECH | Brown, H | Glenn, J.W. |
10/17/77 | 04/21/14 | PDF File | |
Extraction Efficiency | AD | BNL-103978-2014-TECH | Glenn, J | Weisberg, H. |
10/14/77 | 04/21/14 | PDF File | |
Control of rf Verniers During Phaseback and Flat T ... | AD | BNL-103977-2014-TECH | Gill, E | Glenn, J.W.; Weisberg, H. |
10/06/77 | 04/21/14 | PDF File | |
Vertical Phase Space Dilution Studies at Injection ... | AD | BNL-103976-2014-TECH | Raka, E | LeMaire, J.-L. |
09/28/77 | 04/21/14 | PDF File | |
Injection Studies (Sources of Vertical Dilution) | AD | BNL-103975-2014-TECH | Raka, E | LeMaire, J.-L. |
09/22/77 | 04/21/14 | PDF File | |
POTENTIOMETERS FOR POSITION READOUT | AD | BNL-104569-2014-TECH | Curtiss, J | 09/20/77 | 08/27/14 | PDF File | ||
1.5 GeV/c MTX FEB | AD | BNL-103974-2014-TECH | Egelman, E | Gill, E.; LoSecco, J.M.; Sulak, L.R.; Weng, W.T.; ... |
09/12/77 | 04/21/14 | PDF File | |
Vertical Injection Matching Studies | AD | BNL-103973-2014-TECH | Raka, E | LeMaire, J.-L. |
09/09/77 | 04/21/14 | PDF File | |
MAXIMUM SPEED OF MECHANICAL DEVICES IN A DIGITAL C ... | AD | BNL-104568-2014-TECH | Curtiss, J | 09/02/77 | 08/27/14 | PDF File | ||
Vertical Injection Matching Studies | AD | BNL-103971-2014-TECH | Raka, E | LeMaire, J.-L.; Gill, E. |
08/31/77 | 04/21/14 | PDF File | |
STRIPCHART AGS PERFORMANCE MONITOR | AD | BNL-104567-2014-TECH | Poulton, K | Gill, E.; Naase, S.; Glenn, J.W. |
08/24/77 | 08/27/14 | PDF File | |
1.5 GeV/c MTX FEB | AD | BNL-103970-2014-TECH | Blumberg, L | Egelman, E,; Gill, E.; LoSecco, J.M.; Soukas, A.; ... |
08/16/77 | 04/21/14 | PDF File | |
Vertical Beam Size and Emittance at Low and High I ... | AD | BNL-103972-2014-TECH | Raka, E | 08/08/77 | 04/21/14 | PDF File | ||
PROPOSAL TO ELIMINATE PARASITIC HARMONICS IN THE A ... | AD | BNL-104566-2014-TECH | Guidee, P | 07/28/77 | 08/27/14 | PDF File | ||
1.5 GeV/c FEB Extrac. and Emitt. | AD | BNL-103969-2014-TECH | Blumberg, L | Cahill, W.; Egelman, E.; Eld, C.B..; Gill, E.; Gab ... |
07/26/77 | 04/21/14 | PDF File | |
5 GeV/c Slow Spill for Expt. 703 | AD | BNL-103968-2014-TECH | Carroll, A | Glenn, J.W.; Soukas, A. |
07/21/77 | 04/21/14 | PDF File | |
Extract 1.5 GeV/c FEB to U-186 Beam Stop at maximu ... | AD | BNL-103967-2014-TECH | Blumberg, L | Cahill, W.; Egelman, E.; Elliott, E.K.; LoSecco, J ... |
07/01/77 | 04/21/14 | PDF File | |
MEASUREMENTS OF HIGH ENERGY PROTON FLUXES USING FO ... | AD | BNL-104564-2014-TECH | Agoritsas, V | 06/29/77 | 08/27/14 | PDF File | ||
EVALUATION TESTS OF TWO SPECIAL SECONDARY EMISSION ... | AD | BNL-104565-2014-TECH | Agoritsas, V | 06/28/77 | 08/27/14 | PDF File | ||
5 GeV/c low intensity slow spill for Experiment 70 ... | AD | BNL-103966-2014-TECH | Carroll, A | Glenn, J.W.; Soukas, A.; Witkover, R. |
06/23/77 | 04/21/14 | PDF File | |
AGS CABLE TELEVISION SYSTEM | AD | BNL-104563-2014-TECH | Sanders, R | 05/20/77 | 08/27/14 | PDF File | ||
1.5 GeV/c FEB extraction and transport | AD | BNL-103965-2014-TECH | Blumberg, L | Gabusi, J.; Gill, E.; LoSecco, J.M.; Soukas, A.; S ... |
05/09/77 | 04/21/14 | PDF File | |
STUDIES OF SLOW BEAM EXTRACTION WITH AND WITHOUT A ... | AD | BNL-104562-2014-TECH | Glenn, J | Weisberg, H. |
05/06/77 | 08/27/14 | PDF File | |
1.5 GeV/c multi-turn FEB extraction at maximum int ... | AD | BNL-103964-2014-TECH | Blumberg, L | Gabusi, J.; Glenn, J.W.; LoSecco, J.M.; Soukas, A. ... |
04/23/77 | 04/21/14 | PDF File | |
Linac beam bunching at 2.5 MHz (ring rf frequency) ... | AD | BNL-103963-2014-TECH | Fewell, N | 04/21/77 | 04/21/14 | PDF File | ||
AN IMPROVED F10 SWITCHYARD DESIGN | AD | BNL-104561-2014-TECH | Weisberg, H | 04/21/77 | 08/27/14 | PDF File | ||
DIBBUK Users Guide R-2 | AD | BNL-105790-2014-TECH | Lowenstein, D | 04/12/77 | 09/16/14 | PDF File | ||
OPTION FOR IMPROVING THE SLOW EXTRACTED BEAM | AD | BNL-104560-2014-TECH | Weisberg, H | 03/18/77 | 08/27/14 | PDF File | ||
Initial debuncher tests | AD | BNL-103962-2014-TECH | Sheehan, J | 03/12/77 | 04/21/14 | PDF File | ||
1.5 GeV/c FEB extraction | AD | BNL-103960-2014-TECH | Bagley, G | Blumberg, L.; Cahill, W.; Feltman, A.; Gabusi, J.; ... |
02/02/77 | 04/21/14 | PDF File | |
Beam size measurements at ISABELLE intensity; 4 X ... | AD | BNL-103961-2014-TECH | Raka, E | 01/31/77 | 04/21/14 | PDF File | ||
5 GeV/c spill into B line for Exp. 703 | AD | BNL-103957-2014-TECH | Agoritsas, V | Blumberg, L.; Carroll, A.; Feltman, A.; Gill, E.; ... |
01/18/77 | 04/21/14 | PDF File | |
Low energy fast extracted beam in U-line | AD | BNL-103958-2014-TECH | Bagley, G | Blumberg, L.; Feltman, A.; Gabusi, J.; Gill, E.; K ... |
01/18/77 | 04/21/14 | PDF File | |
BEAM SIZE MEASUREMENTS FOR FEB | AD | BNL-104559-2014-TECH | Agoritsas, V | Lee, Y.Y.; Witkover, R. |
01/13/77 | 08/27/14 | PDF File | |
CONSTRUCTION OF LOWER INTENSITY PRIMARY PROTON BEA ... | AD | BNL-104558-2014-TECH | Lee, Y | 01/12/77 | 08/27/14 | PDF File | ||
Linac beam losses | AD | BNL-103956-2014-TECH | Witkover, R | Sheehan, J.; LeMaire, J.-L. |
01/03/77 | 04/21/14 | PDF File | |
Beam size (vertical) before and after transition w ... | AD | BNL-103954-2014-TECH | Raka, E | 12/22/76 | 04/21/14 | PDF File | ||
Beam matching in HEBT IV | AD | BNL-103955-2014-TECH | Gill, E | LeMaire, J.-L. |
12/22/76 | 04/21/14 | PDF File | |
BACKGROUND IN NEUTRINO BEAM DUE TO BEAM LOSS | AD | BNL-104557-2014-TECH | Lee, Y | 12/02/76 | 08/27/14 | PDF File | ||
SEB-FEB sharing | AD | BNL-103959-2014-TECH | Gill, E | Glenn, J.W.; Keane, J.; Lee, Y.Y.; Soukas, A.; Wan ... |
12/01/76 | 04/21/14 | PDF File | |
Affect of Upstream FEB Magnets on AGS Beam Intensi ... | AD | BNL-103953-2014-TECH | Adams, R | Blumberg, L.; Gill, E. |
11/23/76 | 04/21/14 | PDF File | |
NEW 200 MeV BRANCH LINE TO BLIP | AD | BNL-104556-2014-TECH | Lee, Y | 11/10/76 | 08/27/14 | PDF File | ||
SLOW EXTERNAL BEAM LAYOUT AND OPTICS AT THE AGS | AD | BNL-104555-2014-TECH | Lee, Y | 10/28/76 | 08/27/14 | PDF File | ||
WALKERS GUIDE TO DECOHERENCE TIMES IN STOCHASTIC C ... | AD | BNL-104554-2014-TECH | Smith, L | 09/01/76 | 08/27/14 | PDF File | ||
Standardization of nomenclature and identification ... | AD | BNL-105797-2014-TECH | Chimienti, L | Glenn, J.W.; Jablonski, E.; Schuchman, J.C.; Souka ... |
08/04/76 | 09/16/14 | PDF File | |
MEASUREMENTS OF LINAC STEERING DIPOLES | AD | BNL-104553-2014-TECH | LeMaire, J | Stephens, J.; Webster, A.; Witkover, R. |
08/03/76 | 08/27/14 | PDF File | |
DECAY OF FLUCTUATION STATES IN STOCHASTIC COOLING | AD | BNL-104552-2014-TECH | Smith, L | 07/12/76 | 08/27/14 | PDF File | ||
A BEAM LOADING ANALYSIS FOR THE AGS | AD | BNL-104551-2014-TECH | Raka, E | 06/30/76 | 08/27/14 | PDF File | ||
STOCHASTIC COOLING FOR PEDESTRIANS | AD | BNL-104550-2014-TECH | Smith, L | 06/21/76 | 08/27/14 | PDF File | ||
DIBBUK Users Guide R-1 | AD | BNL-105789-2014-TECH | Lowenstein, D | 05/27/76 | 09/16/14 | PDF File | ||
A Datacon-CAMAC module for the DIBBUK control syst ... | AD | BNL-105796-2014-TECH | Frankel, R | 05/27/76 | 09/16/14 | PDF File | ||
Low Intensity (~107 ppp) in -beam. Calibrate vc C ... | AD | BNL-103952-2014-TECH | Balsamo, J | Blumberg, L.; Gill, E.; Glenn, J.W.; Lee, Y.Y.; So ... |
05/06/76 | 04/21/14 | PDF File | |
SEB Efficiency with H20 Electrostatic Septum | AD | BNL-103951-2014-TECH | Blumberg, L | Glenn, J.W.; Soukas, A. |
05/03/76 | 04/21/14 | PDF File | |
THE TRANSVERSE COHERENCE DAMPERS | AD | BNL-104549-2014-TECH | Raka, E | 03/03/76 | 08/27/14 | PDF File | ||
CALIBRATION OF THE SECONDARY EMISSION CHAMBERS CE0 ... | AD | BNL-104548-2014-TECH | Agoritsas, V | Balsamo, J.; Witkover, R. |
01/22/76 | 08/27/14 | PDF File | |
DATCHK - Computer checkout of Datacon II on the PD ... | AD | BNL-105795-2014-TECH | Kovarik, V | 10/23/75 | 09/16/14 | PDF File | ||
MULTIPLE SCATTERING IN THIN LAYERS | AD | BNL-104547-2014-TECH | Smith, L | 08/28/75 | 08/27/14 | PDF File | ||
Datacon II bidirectional line repeater | AD | BNL-105794-2014-TECH | DeGennaro, S | Kovarik, V. |
08/21/75 | 09/16/14 | PDF File | |
SEB Instrumentation gas distribution system | AD | BNL-105793-2014-TECH | Jablonski, E | 08/15/75 | 09/16/14 | PDF File | ||
Maximum intensity pion beams | AD | BNL-105792-2014-TECH | Brown, H | 06/19/75 | 09/16/14 | PDF File | ||
Low Intensity Emittance Measurements for ISA | AD | BNL-103950-2014-TECH | Claus, J | Gill, E.; Gottschalk, R.; Herrera, J.; Month, M.; ... |
05/27/75 | 04/21/14 | PDF File | |
FEB Intensity Measurements with Foils, Transformer ... | AD | BNL-103949-2014-TECH | Cumming, J | 05/12/75 | 04/21/14 | PDF File | ||
DIBBUK Users Guide | AD | BNL-105788-2014-TECH | Lowenstein, D | 05/07/75 | 09/16/14 | PDF File | ||
SUPPRESSION OF TRANSVERSE INSTABILITIES BY OCTUPOL ... | AD | BNL-104546-2014-TECH | Raka, E | Month, M. |
01/28/75 | 08/27/14 | PDF File | |
How to operate Beam 5A | AD | BNL-105787-2014-TECH | Carroll, A | 01/27/75 | 09/16/14 | PDF File | ||
1974 Summer Program - Magentic Measurement Group | AD | BNL-105786-2014-TECH | Hsieh, S | 12/03/74 | 09/16/14 | PDF File | ||
IMPROVEMENT I N THE BOND STRENGTH OF METAL TO CERA ... | AD | BNL-104545-2014-TECH | McKenzie-Wilson, R | 10/25/74 | 08/27/14 | PDF File | ||
BEAM LOSS DUE TO G10 TARGETING | AD | BNL-104544-2014-TECH | Blumberg, L | Glenn, J.W.; Hornstra, F.; Keane, J.; Lee, Y.Y.; M ... |
09/17/74 | 08/27/14 | PDF File | |
Test of High Voltage (120 kV peak) Acceleration | AD | BNL-103948-2014-TECH | Raka, E | Gill, E. |
09/15/74 | 04/21/14 | PDF File | |
SLOW BEAM EXTRACTION EFFICIENCY MEASUREMENT USING ... | AD | BNL-104543-2014-TECH | Hornstra, F | 09/11/74 | 08/27/14 | PDF File | ||
Optics of Beam #B5 | AD | BNL-105785-2014-TECH | Ryan, D | 09/09/74 | 09/16/14 | PDF File | ||
Neutron spectrum in Beam #6A | AD | BNL-105784-2014-TECH | Ryan, D | 09/05/74 | 09/16/14 | PDF File | ||
Test of H20 Electrostatic Septum for SEB | AD | BNL-103947-2014-TECH | Bagley, G | Blumberg, L.; Glenn, J.W.; Hsieh, H.C.H.; Keane, J ... |
08/20/74 | 04/21/14 | PDF File | |
SEB Extraction Efficiency vs. F10 Magnet Position | AD | BNL-103946-2014-TECH | Blumberg, L | Glenn, J.W. |
08/16/74 | 04/21/14 | PDF File | |
Test New Instrumentation in Linac and HEBT | AD | BNL-103945-2014-TECH | Batchelor, K | Sheehan, J.; Witkover, R.; Fewell, N.; Lankshear, ... |
07/16/74 | 04/21/14 | PDF File | |
Measure Linear Coupling at 2, 14, 26 and 28.5 GeV/ ... | AD | BNL-103944-2014-TECH | Raka, E | Month, M. |
07/12/74 | 04/21/14 | PDF File | |
MAINTENANCE - OPERATING INSTRUCTIONS FAST BACKLEG ... | AD | BNL-104542-2014-TECH | Bagley, G | 07/11/74 | 08/27/14 | PDF File | ||
Steering and Tuning with new Optics in LEBT | AD | BNL-103943-2014-TECH | van Steenbergen, A | Batchelor, K.; Fewell, N. |
07/01/74 | 04/21/14 | PDF File | |
Progress during FY 1974 | AD | BNL-105783-2014-TECH | Walker, W | 06/19/74 | 09/16/14 | PDF File | ||
STRIPPING OF H- IN A MAGNETIC FIELD | AD | BNL-104541-2014-TECH | Prelec, K | 06/04/74 | 08/27/14 | PDF File | ||
Beam Capture in High Voltage (150 KV peak) mode. ... | AD | BNL-103942-2014-TECH | Raka, E | 05/10/74 | 04/21/14 | PDF File | ||
Beam Stacking to Restore Early CBM to 1.8 1013 | AD | BNL-103941-2014-TECH | van Steenbergen, A | Claus, J.; Herrera, J. |
05/09/74 | 04/21/14 | PDF File | |
I10 Magnet Position vs. Early CBM. I10 Extraction | AD | BNL-103940-2014-TECH | Keane, J | Cornish, G. |
05/08/74 | 04/21/14 | PDF File | |
Beam Tuning to Maximize Accelerated Beam | AD | BNL-103939-2014-TECH | Raka, E | Gill, E.; Herrera, J. |
04/16/74 | 04/21/14 | PDF File | |
Synchronization of MG set Frequency with Line | AD | BNL-103938-2014-TECH | Cottingham, J | Gottschalk, R.; Feltman, A. |
04/08/74 | 04/21/14 | PDF File | |
E15 Kicker for 9H Measurement. Bunch Shape Osc. | AD | BNL-103936-2014-TECH | Raka, E | 04/04/74 | 04/21/14 | PDF File | ||
Use of the multi-purpose transformer units | AD | BNL-105781-2014-TECH | Thornhill, F | 04/02/74 | 09/16/14 | PDF File | ||
Horizontal Beam Size Measurement at F20 | AD | BNL-103937-2014-TECH | Herrera, J | 04/01/74 | 04/21/14 | PDF File | ||
Transition Losses vs. Beam Intensity | AD | BNL-103935-2014-TECH | Raka, E | 03/15/74 | 04/21/14 | PDF File |