Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 26 27 28 29 30 > >> | ||||||||
Initial debuncher tests | AD | BNL-103962-2014-TECH | Sheehan, J | 03/12/77 | 04/21/14 | PDF File | ||
1.5 GeV/c FEB extraction | AD | BNL-103960-2014-TECH | Bagley, G | Blumberg, L.; Cahill, W.; Feltman, A.; Gabusi, J.; ... |
02/02/77 | 04/21/14 | PDF File | |
Beam size measurements at ISABELLE intensity; 4 X ... | AD | BNL-103961-2014-TECH | Raka, E | 01/31/77 | 04/21/14 | PDF File | ||
5 GeV/c spill into B line for Exp. 703 | AD | BNL-103957-2014-TECH | Agoritsas, V | Blumberg, L.; Carroll, A.; Feltman, A.; Gill, E.; ... |
01/18/77 | 04/21/14 | PDF File | |
Low energy fast extracted beam in U-line | AD | BNL-103958-2014-TECH | Bagley, G | Blumberg, L.; Feltman, A.; Gabusi, J.; Gill, E.; K ... |
01/18/77 | 04/21/14 | PDF File | |
BEAM SIZE MEASUREMENTS FOR FEB | AD | BNL-104559-2014-TECH | Agoritsas, V | Lee, Y.Y.; Witkover, R. |
01/13/77 | 08/27/14 | PDF File | |
CONSTRUCTION OF LOWER INTENSITY PRIMARY PROTON BEA ... | AD | BNL-104558-2014-TECH | Lee, Y | 01/12/77 | 08/27/14 | PDF File | ||
Linac beam losses | AD | BNL-103956-2014-TECH | Witkover, R | Sheehan, J.; LeMaire, J.-L. |
01/03/77 | 04/21/14 | PDF File | |
Beam size (vertical) before and after transition w ... | AD | BNL-103954-2014-TECH | Raka, E | 12/22/76 | 04/21/14 | PDF File | ||
Beam matching in HEBT IV | AD | BNL-103955-2014-TECH | Gill, E | LeMaire, J.-L. |
12/22/76 | 04/21/14 | PDF File | |
BACKGROUND IN NEUTRINO BEAM DUE TO BEAM LOSS | AD | BNL-104557-2014-TECH | Lee, Y | 12/02/76 | 08/27/14 | PDF File | ||
SEB-FEB sharing | AD | BNL-103959-2014-TECH | Gill, E | Glenn, J.W.; Keane, J.; Lee, Y.Y.; Soukas, A.; Wan ... |
12/01/76 | 04/21/14 | PDF File | |
Affect of Upstream FEB Magnets on AGS Beam Intensi ... | AD | BNL-103953-2014-TECH | Adams, R | Blumberg, L.; Gill, E. |
11/23/76 | 04/21/14 | PDF File | |
NEW 200 MeV BRANCH LINE TO BLIP | AD | BNL-104556-2014-TECH | Lee, Y | 11/10/76 | 08/27/14 | PDF File | ||
SLOW EXTERNAL BEAM LAYOUT AND OPTICS AT THE AGS | AD | BNL-104555-2014-TECH | Lee, Y | 10/28/76 | 08/27/14 | PDF File | ||
WALKERS GUIDE TO DECOHERENCE TIMES IN STOCHASTIC C ... | AD | BNL-104554-2014-TECH | Smith, L | 09/01/76 | 08/27/14 | PDF File | ||
Standardization of nomenclature and identification ... | AD | BNL-105797-2014-TECH | Chimienti, L | Glenn, J.W.; Jablonski, E.; Schuchman, J.C.; Souka ... |
08/04/76 | 09/16/14 | PDF File | |
MEASUREMENTS OF LINAC STEERING DIPOLES | AD | BNL-104553-2014-TECH | LeMaire, J | Stephens, J.; Webster, A.; Witkover, R. |
08/03/76 | 08/27/14 | PDF File | |
DECAY OF FLUCTUATION STATES IN STOCHASTIC COOLING | AD | BNL-104552-2014-TECH | Smith, L | 07/12/76 | 08/27/14 | PDF File | ||
A BEAM LOADING ANALYSIS FOR THE AGS | AD | BNL-104551-2014-TECH | Raka, E | 06/30/76 | 08/27/14 | PDF File | ||
STOCHASTIC COOLING FOR PEDESTRIANS | AD | BNL-104550-2014-TECH | Smith, L | 06/21/76 | 08/27/14 | PDF File | ||
DIBBUK Users Guide R-1 | AD | BNL-105789-2014-TECH | Lowenstein, D | 05/27/76 | 09/16/14 | PDF File | ||
A Datacon-CAMAC module for the DIBBUK control syst ... | AD | BNL-105796-2014-TECH | Frankel, R | 05/27/76 | 09/16/14 | PDF File | ||
Low Intensity (~107 ppp) in -beam. Calibrate vc C ... | AD | BNL-103952-2014-TECH | Balsamo, J | Blumberg, L.; Gill, E.; Glenn, J.W.; Lee, Y.Y.; So ... |
05/06/76 | 04/21/14 | PDF File | |
SEB Efficiency with H20 Electrostatic Septum | AD | BNL-103951-2014-TECH | Blumberg, L | Glenn, J.W.; Soukas, A. |
05/03/76 | 04/21/14 | PDF File | |
THE TRANSVERSE COHERENCE DAMPERS | AD | BNL-104549-2014-TECH | Raka, E | 03/03/76 | 08/27/14 | PDF File | ||
CALIBRATION OF THE SECONDARY EMISSION CHAMBERS CE0 ... | AD | BNL-104548-2014-TECH | Agoritsas, V | Balsamo, J.; Witkover, R. |
01/22/76 | 08/27/14 | PDF File | |
DATCHK - Computer checkout of Datacon II on the PD ... | AD | BNL-105795-2014-TECH | Kovarik, V | 10/23/75 | 09/16/14 | PDF File | ||
MULTIPLE SCATTERING IN THIN LAYERS | AD | BNL-104547-2014-TECH | Smith, L | 08/28/75 | 08/27/14 | PDF File | ||
Datacon II bidirectional line repeater | AD | BNL-105794-2014-TECH | DeGennaro, S | Kovarik, V. |
08/21/75 | 09/16/14 | PDF File | |
SEB Instrumentation gas distribution system | AD | BNL-105793-2014-TECH | Jablonski, E | 08/15/75 | 09/16/14 | PDF File | ||
Maximum intensity pion beams | AD | BNL-105792-2014-TECH | Brown, H | 06/19/75 | 09/16/14 | PDF File | ||
Low Intensity Emittance Measurements for ISA | AD | BNL-103950-2014-TECH | Claus, J | Gill, E.; Gottschalk, R.; Herrera, J.; Month, M.; ... |
05/27/75 | 04/21/14 | PDF File | |
FEB Intensity Measurements with Foils, Transformer ... | AD | BNL-103949-2014-TECH | Cumming, J | 05/12/75 | 04/21/14 | PDF File | ||
DIBBUK Users Guide | AD | BNL-105788-2014-TECH | Lowenstein, D | 05/07/75 | 09/16/14 | PDF File | ||
SUPPRESSION OF TRANSVERSE INSTABILITIES BY OCTUPOL ... | AD | BNL-104546-2014-TECH | Raka, E | Month, M. |
01/28/75 | 08/27/14 | PDF File | |
How to operate Beam 5A | AD | BNL-105787-2014-TECH | Carroll, A | 01/27/75 | 09/16/14 | PDF File | ||
1974 Summer Program - Magentic Measurement Group | AD | BNL-105786-2014-TECH | Hsieh, S | 12/03/74 | 09/16/14 | PDF File | ||
IMPROVEMENT I N THE BOND STRENGTH OF METAL TO CERA ... | AD | BNL-104545-2014-TECH | McKenzie-Wilson, R | 10/25/74 | 08/27/14 | PDF File | ||
BEAM LOSS DUE TO G10 TARGETING | AD | BNL-104544-2014-TECH | Blumberg, L | Glenn, J.W.; Hornstra, F.; Keane, J.; Lee, Y.Y.; M ... |
09/17/74 | 08/27/14 | PDF File | |
Test of High Voltage (120 kV peak) Acceleration | AD | BNL-103948-2014-TECH | Raka, E | Gill, E. |
09/15/74 | 04/21/14 | PDF File | |
SLOW BEAM EXTRACTION EFFICIENCY MEASUREMENT USING ... | AD | BNL-104543-2014-TECH | Hornstra, F | 09/11/74 | 08/27/14 | PDF File | ||
Optics of Beam #B5 | AD | BNL-105785-2014-TECH | Ryan, D | 09/09/74 | 09/16/14 | PDF File | ||
Neutron spectrum in Beam #6A | AD | BNL-105784-2014-TECH | Ryan, D | 09/05/74 | 09/16/14 | PDF File | ||
Test of H20 Electrostatic Septum for SEB | AD | BNL-103947-2014-TECH | Bagley, G | Blumberg, L.; Glenn, J.W.; Hsieh, H.C.H.; Keane, J ... |
08/20/74 | 04/21/14 | PDF File | |
SEB Extraction Efficiency vs. F10 Magnet Position | AD | BNL-103946-2014-TECH | Blumberg, L | Glenn, J.W. |
08/16/74 | 04/21/14 | PDF File | |
Test New Instrumentation in Linac and HEBT | AD | BNL-103945-2014-TECH | Batchelor, K | Sheehan, J.; Witkover, R.; Fewell, N.; Lankshear, ... |
07/16/74 | 04/21/14 | PDF File | |
Measure Linear Coupling at 2, 14, 26 and 28.5 GeV/ ... | AD | BNL-103944-2014-TECH | Raka, E | Month, M. |
07/12/74 | 04/21/14 | PDF File | |
MAINTENANCE - OPERATING INSTRUCTIONS FAST BACKLEG ... | AD | BNL-104542-2014-TECH | Bagley, G | 07/11/74 | 08/27/14 | PDF File | ||
Steering and Tuning with new Optics in LEBT | AD | BNL-103943-2014-TECH | van Steenbergen, A | Batchelor, K.; Fewell, N. |
07/01/74 | 04/21/14 | PDF File | |
Progress during FY 1974 | AD | BNL-105783-2014-TECH | Walker, W | 06/19/74 | 09/16/14 | PDF File | ||
STRIPPING OF H- IN A MAGNETIC FIELD | AD | BNL-104541-2014-TECH | Prelec, K | 06/04/74 | 08/27/14 | PDF File | ||
Beam Capture in High Voltage (150 KV peak) mode. ... | AD | BNL-103942-2014-TECH | Raka, E | 05/10/74 | 04/21/14 | PDF File | ||
Beam Stacking to Restore Early CBM to 1.8 1013 | AD | BNL-103941-2014-TECH | van Steenbergen, A | Claus, J.; Herrera, J. |
05/09/74 | 04/21/14 | PDF File | |
I10 Magnet Position vs. Early CBM. I10 Extraction | AD | BNL-103940-2014-TECH | Keane, J | Cornish, G. |
05/08/74 | 04/21/14 | PDF File | |
Beam Tuning to Maximize Accelerated Beam | AD | BNL-103939-2014-TECH | Raka, E | Gill, E.; Herrera, J. |
04/16/74 | 04/21/14 | PDF File | |
Synchronization of MG set Frequency with Line | AD | BNL-103938-2014-TECH | Cottingham, J | Gottschalk, R.; Feltman, A. |
04/08/74 | 04/21/14 | PDF File | |
E15 Kicker for 9H Measurement. Bunch Shape Osc. | AD | BNL-103936-2014-TECH | Raka, E | 04/04/74 | 04/21/14 | PDF File | ||
Use of the multi-purpose transformer units | AD | BNL-105781-2014-TECH | Thornhill, F | 04/02/74 | 09/16/14 | PDF File | ||
Horizontal Beam Size Measurement at F20 | AD | BNL-103937-2014-TECH | Herrera, J | 04/01/74 | 04/21/14 | PDF File | ||
Transition Losses vs. Beam Intensity | AD | BNL-103935-2014-TECH | Raka, E | 03/15/74 | 04/21/14 | PDF File | ||
Vertical Beam Size at J19 vs. Time in Cycle | AD | BNL-103934-2014-TECH | Herrera, J | 03/09/74 | 04/21/14 | PDF File | ||
Activate Triple Switch at Transition | AD | BNL-103933-2014-TECH | Raka, E | 03/05/74 | 04/21/14 | PDF File | ||
Computer control of secondary beams | AD | BNL-105782-2014-TECH | Lowenstein, D | 03/01/74 | 09/16/14 | PDF File | ||
LESB Secondary Intensity vs. C.Target Material | AD | BNL-103932-2014-TECH | Glenn, J | Smith, S. |
02/28/74 | 04/21/14 | PDF File | |
Intensity vs. RF Gap Voltage on J-Station | AD | BNL-103931-2014-TECH | Raka, E | 02/20/74 | 04/21/14 | PDF File | ||
LINAC HIGH VOLTAGE CABLE ASSEMBLY | AD | BNL-104540-2014-TECH | Damm, R | 01/31/74 | 08/27/14 | PDF File | ||
Low Field Tuning. Effect of Shorting 8 RF Cavitie ... | AD | BNL-103930-2014-TECH | Raka, E | Gill, E. |
01/24/74 | 04/21/14 | PDF File | |
FEB Instrumentation Tests | AD | BNL-103929-2014-TECH | Bennett, G | 01/23/74 | 04/21/14 | PDF File | ||
Beam Tuning with low Field Corrections | AD | BNL-103928-2014-TECH | Herrera, J | Barton, M.Q. |
01/14/74 | 04/21/14 | PDF File | |
Intensity vs. Operating point (?H, ?H) at Injectio ... | AD | BNL-103927-2014-TECH | Barton, M | Claus, J.; Gill, E.; Herrera, J. |
12/04/73 | 04/21/14 | PDF File | |
Tune measurements using computer fit to perturbed ... | AD | BNL-103926-2014-TECH | Barton, M | 12/01/73 | 04/21/14 | PDF File | ||
Injection Capture vs. B | AD | BNL-103925-2014-TECH | Herrera, J | Raka, E. |
11/20/73 | 04/21/14 | PDF File | |
Capture Efficiency vs. Impedance of RF Cavities | AD | BNL-103924-2014-TECH | Barton, M | Raka, E.; Gill, E. |
11/14/73 | 04/21/14 | PDF File | |
Single and Multiturn Stacking Efficiency | AD | BNL-103923-2014-TECH | van Steenbergen, A | 10/24/73 | 04/21/14 | PDF File | ||
Measure Aperture on 28.5 GeV/c Flattop | AD | BNL-103922-2014-TECH | Gill, E | Raka, E. |
10/06/73 | 04/21/14 | PDF File | |
Continue Check of Linac and HEBT Parameters | AD | BNL-103920-2014-TECH | Claus, J | Herrera, J.; Gill, E.; Raka, E.; van Steenbergen, ... |
10/03/73 | 04/21/14 | PDF File | |
Measure FEB Extraction Efficiency, Calibrate Trans ... | AD | BNL-103921-2014-TECH | Balsamo, J | Bennett, G.W.; Blumberg, L.; Glasmann, R.; Guthy, ... |
10/03/73 | 04/21/14 | PDF File | |
Test 30 GeV/c FEB Extraction | AD | BNL-103919-2014-TECH | Bennett, G | 10/03/73 | 04/21/14 | PDF File | ||
Reproducibility of linac and HEBT Parameters | AD | BNL-103918-2014-TECH | van Steenbergen, A | Claus, J.; Fewell, N.; Gill, E.; Sheehan, J.F. |
09/26/73 | 04/21/14 | PDF File | |
Extract FEB up to 8 Bend Point | AD | BNL-103917-2014-TECH | Bennett, G | Blumberg, L.; Casey, W.R.; Culwick, B.B.; Glasmann ... |
09/12/73 | 04/21/14 | PDF File | |
Repeat of 5/2/73 Study of Low Field Orbit Harmonic ... | AD | BNL-103916-2014-TECH | Barton, M | 09/05/73 | 04/21/14 | PDF File | ||
ACCELERATION OF HEAVY IONS IN THE AGS | AD | BNL-104539-2014-TECH | Prelec, K | 09/05/73 | 08/27/14 | PDF File | ||
Linear Coupling on Flattop. Beam-induced Signal o ... | AD | BNL-103915-2014-TECH | Raka, E | 09/04/73 | 04/21/14 | PDF File | ||
Tune AGS | AD | BNL-103914-2014-TECH | Raka, E | Gill, E.; Herrera, J. |
08/29/73 | 04/21/14 | PDF File | |
Positional stability of the EEBA floor and of a lo ... | AD | BNL-105779-2014-TECH | Willis, W | 08/22/73 | 09/16/14 | PDF File | ||
Ideas for a new low energy separated beam | AD | BNL-105780-2014-TECH | Willis, W | 08/22/73 | 09/16/14 | PDF File | ||
Extract 9 x 1012 Beam Into Test Channel-H10 pos.vs ... | AD | BNL-103913-2014-TECH | Blumberg, L | Glasmann, R.; Guthy, J.; Keane, J.; Raka, E. |
08/21/73 | 04/21/14 | PDF File | |
Set up of FEB Power Supply Amplitudes, Timing, Pol ... | AD | BNL-103912-2014-TECH | Blumberg, L | Keane, J. |
08/15/73 | 04/21/14 | PDF File | |
Some more observed properties of the low energy se ... | AD | BNL-105777-2014-TECH | Carroll, A | Chiang, I-H.; Kycia, T.F.; Li, K.K.; Mazur, P.O.; ... |
07/01/73 | 09/16/14 | PDF File | |
Computer control in AGS experimental area | AD | BNL-105776-2014-TECH | Loper, R | 06/26/73 | 09/16/14 | PDF File | ||
HEBT Emittance programs: LINEM and EMIT | AD | BNL-105778-2014-TECH | Brown, H | 06/21/73 | 09/16/14 | PDF File | ||
POSSIBLE INJECTION LINES FOR H- INJECTION | AD | BNL-104538-2014-TECH | Barton, M | 06/20/73 | 08/27/14 | PDF File | ||
Intensity of Early and Late CBM vs. Multi-turn Int ... | AD | BNL-103911-2014-TECH | Herrera, J | 06/15/73 | 04/21/14 | PDF File | ||
DESCRIPTION OF THE SLOW EXTRACTED BEAM SECURITY SY ... | AD | BNL-104537-2014-TECH | McGeary, A | 06/15/73 | 08/27/14 | PDF File | ||
CS INJECTION INTO A DUOPLASMATRON | AD | BNL-104536-2014-TECH | Lawrence, G | Hayward, T.; Prelec, K.; Sluyters, Th. |
06/06/73 | 08/27/14 | PDF File | |
Horizontal Emittance at High Intensity, try I10 Ex ... | AD | BNL-103910-2014-TECH | Bennett, G | Blumberg, L.; Glasmann, R.; Guthy, J.; Keane, J.; ... |
05/25/73 | 04/21/14 | PDF File | |
Measure Horizontal profiles of FEB in Test Beam | AD | BNL-103909-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/16/73 | 04/21/14 | PDF File | |
Measure Vertical Emittance of FEB in Test Beam | AD | BNL-103908-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/14/73 | 04/21/14 | PDF File | |
Optimize H10 Magnet Position, Test Instrumentation ... | AD | BNL-103906-2014-TECH | Bennett, G | Blumberg, L.; Guthy, J.; Keane, J. |
05/10/73 | 04/21/14 | PDF File |