Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 2 3 4 5 6 > >> | ||||||||
STRIPCHART AGS PERFORMANCE MONITOR | AD | BNL-104567-2014-TECH | Poulton, K | Gill, E.; Naase, S.; Glenn, J.W. |
08/24/77 | 08/27/14 | PDF File | |
Vertical Injection Matching Studies | AD | BNL-103971-2014-TECH | Raka, E | LeMaire, J.-L.; Gill, E. |
08/31/77 | 04/21/14 | PDF File | |
MAXIMUM SPEED OF MECHANICAL DEVICES IN A DIGITAL C ... | AD | BNL-104568-2014-TECH | Curtiss, J | 09/02/77 | 08/27/14 | PDF File | ||
Vertical Injection Matching Studies | AD | BNL-103973-2014-TECH | Raka, E | LeMaire, J.-L. |
09/09/77 | 04/21/14 | PDF File | |
1.5 GeV/c MTX FEB | AD | BNL-103974-2014-TECH | Egelman, E | Gill, E.; LoSecco, J.M.; Sulak, L.R.; Weng, W.T.; ... |
09/12/77 | 04/21/14 | PDF File | |
POTENTIOMETERS FOR POSITION READOUT | AD | BNL-104569-2014-TECH | Curtiss, J | 09/20/77 | 08/27/14 | PDF File | ||
Injection Studies (Sources of Vertical Dilution) | AD | BNL-103975-2014-TECH | Raka, E | LeMaire, J.-L. |
09/22/77 | 04/21/14 | PDF File | |
Vertical Phase Space Dilution Studies at Injection ... | AD | BNL-103976-2014-TECH | Raka, E | LeMaire, J.-L. |
09/28/77 | 04/21/14 | PDF File | |
Control of rf Verniers During Phaseback and Flat T ... | AD | BNL-103977-2014-TECH | Gill, E | Glenn, J.W.; Weisberg, H. |
10/06/77 | 04/21/14 | PDF File | |
Extraction Efficiency | AD | BNL-103978-2014-TECH | Glenn, J | Weisberg, H. |
10/14/77 | 04/21/14 | PDF File | |
Beam steering | AD | BNL-103981-2014-TECH | Brown, H | Glenn, J.W. |
10/17/77 | 04/21/14 | PDF File | |
Fast Repetition Rate of AGS | AD | BNL-103979-2014-TECH | Weng, W | Gill, E. |
10/19/77 | 04/21/14 | PDF File | |
Injection Matching and Dilution Studies | AD | BNL-103980-2014-TECH | LeMaire, J | Raka, E. |
10/20/77 | 04/21/14 | PDF File | |
Linac Emittance and Momentum Spread Variation with ... | AD | BNL-103983-2014-TECH | Witkover, R | Fewell, N. |
10/20/77 | 05/05/14 | PDF File | |
Investigation of A-line Transport Losses | AD | BNL-103982-2014-TECH | Glenn, J | 10/27/77 | 05/05/14 | PDF File | ||
Further Investigation of A-line transport losses | AD | BNL-103984-2014-TECH | Brown, H | Glenn, J.W. |
12/02/77 | 05/05/14 | PDF File | |
TESTS OF AN ELECTROSTATIC WIRE SEPTUM MODEL IN THE ... | AD | BNL-104570-2014-TECH | Glenn, J | Weisberg, H. |
12/14/77 | 08/27/14 | PDF File | |
Longitudinal Impedance Investigations at 28.5 GeV | AD | BNL-103985-2014-TECH | Pedersen, F | Raka, E.; Gill, E. |
12/19/77 | 05/05/14 | PDF File | |
AGS INTERNAL TARGETS | AD | BNL-104571-2014-TECH | Gill, E | Nasse, S.; Gabusi, J. |
01/24/78 | 08/27/14 | PDF File | |
LEAD PLATED C-RING EVALUATION | AD | BNL-104572-2014-TECH | Jahelka, J | 01/27/78 | 08/27/14 | PDF File | ||
VIDEO SPLATTER ON VERSATEC HARD COPY | AD | BNL-104573-2014-TECH | Frey, W | 02/14/78 | 08/27/14 | PDF File | ||
GAUSS CLOCK CALIBRATION | AD | BNL-104574-2014-TECH | Weisberg, H | 03/13/78 | 08/27/14 | PDF File | ||
Longitudinal Phase Space Studies | AD | BNL-103986-2014-TECH | Raka, E | Gill, E. |
03/29/78 | 05/05/14 | PDF File | |
Longitudinal Impedance Measurements II | AD | BNL-103987-2014-TECH | Pedersen, F | Raka, E.; Gill, E. |
04/06/78 | 05/05/14 | PDF File | |
DIBBUK Users Guide R-3 | AD | BNL-105791-2014-TECH | Lowenstein, D | 04/12/78 | 09/16/14 | PDF File | ||
Longitudinal Impedance Measurements III | AD | BNL-103988-2014-TECH | Pedersen, F | Raka, E.; Gill, E. |
04/13/78 | 05/05/14 | PDF File | |
Calibration of magneto-resistive probes in A1D5 an ... | AD | BNL-105798-2014-TECH | Brown, H | 04/26/78 | 09/16/14 | PDF File | ||
AN EIGHT-CHANNEL HIGH VOLTAGE BIAS SUPPLY | AD | BNL-104575-2014-TECH | Curtiss, J | Klein, J.D.; Witkover, R. |
05/09/78 | 08/27/14 | PDF File | |
Radial Control of Magnetic Field or a 6.75 GeV/c F ... | AD | BNL-103989-2014-TECH | Raka, E | Gill, E.; Feltman, A. |
07/10/78 | 05/05/14 | PDF File | |
Controlling Beam Dumping | AD | BNL-103990-2014-TECH | Glenn, J | 07/12/78 | 05/05/14 | PDF File | ||
C SEC Scan and Calibration | AD | BNL-103991-2014-TECH | Soukas, A | Glenn, J.W. |
07/12/78 | 05/05/14 | PDF File | |
Longitudinal Impedance Measurement IV | AD | BNL-103992-2014-TECH | Raka, E | Gill, E. |
07/16/78 | 05/05/14 | PDF File | |
Calibration of the internal hall probes in A1D5 & ... | AD | BNL-105799-2014-TECH | Brown, H | 07/26/78 | 09/16/14 | PDF File | ||
Longitudinal Impedance Measurement V | AD | BNL-103993-2014-TECH | Raka, E | Gill, E.; Ahrens, L. |
08/24/78 | 05/05/14 | PDF File | |
SEB SPILL SERVO | AD | BNL-104576-2014-TECH | Gabusi, J | Glenn, J.W.; Samadani, R.; Soukas, A. |
09/29/78 | 08/27/14 | PDF File | |
Longitudinal Impedance Measurement VI | AD | BNL-103994-2014-TECH | Raka, E | Ahrens, L. |
10/05/78 | 05/05/14 | PDF File | |
LOW FIELD CORRECTION READBACK EVALUATION | AD | BNL-104578-2014-TECH | Frey, W | 11/15/78 | 08/27/14 | PDF File | ||
Analog Sampling Program | AD | BNL-105800-2014-TECH | Kovarik, V | Stoehr, R. |
11/20/78 | 09/16/14 | PDF File | |
Longitudinal Impedance Measurements VII | AD | BNL-103995-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
11/27/78 | 05/05/14 | PDF File | |
CONTINUITY OF ELECTRIC POWER AT THE AGS | AD | BNL-104577-2014-TECH | Curtiss, J | 12/14/78 | 08/27/14 | PDF File | ||
Longitudinal Impedance Measurements VIII | AD | BNL-103996-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
12/22/78 | 05/05/14 | PDF File | |
Longitudinal Impedance Measurements IX | AD | BNL-103999-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
01/22/79 | 05/05/14 | PDF File | |
AGS MAIN MAGNET POWER SUPPLY LIMITATIONS OF LONG F ... | AD | BNL-104579-2014-TECH | Cottingham, J | Davis, D.A.; Feltman, A. |
01/22/79 | 08/27/14 | PDF File | |
Longitudinal Coupling Impedance Measurements | AD | BNL-104000-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
02/22/79 | 05/05/14 | PDF File | |
F5 Vertical Aperture Investigation | AD | BNL-103997-2014-TECH | Glenn, J | 02/22/79 | 05/05/14 | PDF File | ||
Analog Sampling Program 2 | AD | BNL-105801-2014-TECH | Stoehr, R | Kovarik, V. |
03/02/79 | 09/16/14 | PDF File | |
Electrostatic Splitter Test in the C Line | AD | BNL-103998-2014-TECH | Glenn, J | Weisberg, H. |
03/21/79 | 05/05/14 | PDF File | |
F5 SEPTUM FAILURE ANALYSIS | AD | BNL-104580-2014-TECH | Cottingham, J | 03/22/79 | 08/27/14 | PDF File | ||
Longitudinal Impedance Measurement at 3 BeV/c | AD | BNL-104001-2014-TECH | Raka, E | Ahrens, L.; Gill, E. |
04/14/79 | 05/05/14 | PDF File | |
AGS CABLE TELEVISION SYSTEM (FREY) | AD | BNL-104581-2014-TECH | Frey, W | 04/17/79 | 08/27/14 | PDF File | ||
H5 BEAM KICKER NOSE BUMP AND COIL POSITION DETERMI ... | AD | BNL-104582-2014-TECH | Cottingham, J | 05/01/79 | 08/27/14 | PDF File | ||
A measurement of the production of low energy pion ... | AD | BNL-105802-2014-TECH | Fox, J | Cohen, R.C.; Sachs, A.M. |
05/11/79 | 09/16/14 | PDF File | |
The ISA detector test facility | AD | BNL-105803-2014-TECH | Yamin, P | 07/20/79 | 09/16/14 | PDF File | ||
Performance of the C1 Beam | AD | BNL-105804-2014-TECH | Yamin, P | 07/27/79 | 09/16/14 | PDF File | ||
SEB EMITTANCE MEASUREMENTS | AD | BNL-104583-2014-TECH | Weisberg, H | 10/17/79 | 08/27/14 | PDF File | ||
NORMALIZED SUM/DIFFERENCE MONITOR FOR PICK-UP ELEC ... | AD | BNL-104584-2014-TECH | Preston, R | Ahrens, L.; Gill, E. |
11/08/79 | 08/27/14 | PDF File | |
AGS VACUUM SEAL GUIDE | AD | BNL-104585-2014-TECH | Jahelka, J | 12/12/79 | 08/27/14 | PDF File | ||
Longitudinal Phase Space Measurements | AD | BNL-104002-2014-TECH | Ahrens, L | Gill, E.; Raka, E. |
12/13/79 | 05/05/14 | PDF File | |
NOTES ON SPECIAL AGS MAIN RING VACUUM CHAMBERS | AD | BNL-104586-2014-TECH | Jahelka, J | 12/14/79 | 08/27/14 | PDF File | ||
FEB PERFORMANCE DATA TRANSMISSION | AD | BNL-104587-2014-TECH | Cornish, G | Gabusi, J.; Glenn, J.W.; Warkentien, R. |
12/17/79 | 08/27/14 | PDF File | |
HEBT STEERING (HEBST) | AD | BNL-104588-2014-TECH | Gill, E | Nasse, S.; Martin, F.; Dabrowski, J. |
01/14/80 | 08/27/14 | PDF File | |
FUTURE AGS CONTROL STATIONS | AD | BNL-104589-2014-TECH | Skelly, J | 01/16/80 | 08/27/14 | PDF File | ||
MULTICHANNEL DISPLAY SYSTEM EXPANSION | AD | BNL-104590-2014-TECH | Frey, W | 03/17/80 | 08/27/14 | PDF File | ||
SEC Response | AD | BNL-104003-2014-TECH | Glenn, J | 04/01/80 | 05/05/14 | PDF File | ||
EFFECTIVE SPILL LENGTH MONITOR | AD | BNL-104591-2014-TECH | Weisberg, H | 04/14/80 | 08/27/14 | PDF File | ||
DATACON, THE AGS COMPUTER CONTROL SYSTEM | AD | BNL-104592-2014-TECH | Curtiss, J | 05/16/80 | 08/27/14 | PDF File | ||
SENSITIVITY REQUIREMENT OF THE HIGH ENERGY POLARIM ... | AD | BNL-104593-2014-TECH | Lee, Y | 05/30/80 | 08/27/14 | PDF File | ||
AGS WIDE BAND WALL CURRENT MONITOR | AD | BNL-104594-2014-TECH | Ahrens, L | 06/02/80 | 08/27/14 | PDF File | ||
A time separated p beam | AD | BNL-105805-2014-TECH | Brown, H | 06/02/80 | 09/16/14 | PDF File | ||
Analysis of the cooldown time of the D bend superc ... | AD | BNL-105807-2014-TECH | Keith, W | Gulotta, G. |
07/10/80 | 09/16/14 | PDF File | |
Beam Profile Measurement at A171 Flag | AD | BNL-104004-2014-TECH | Carroll, A | Ewing, B.; Glenn, J.W. |
08/05/80 | 05/05/14 | PDF File | |
A study of the sensitivity of an ISABELLE cos? dip ... | AD | BNL-105808-2014-TECH | Bozoki, G | Bunce, G.; Danby, G.; Foelsche, H.; Jackson, J.; K ... |
08/27/80 | 09/16/14 | PDF File | |
LOCATION OF SEB DRIVE SEXTUPOLES | AD | BNL-104595-2014-TECH | Barge, D | Glenn, J.W. |
09/16/80 | 08/27/14 | PDF File | |
SEC Response Continued | AD | BNL-104005-2014-TECH | Glenn, J | 11/01/80 | 05/05/14 | PDF File | ||
SEB Size Comparison | AD | BNL-104007-2014-TECH | Ryan, J | 12/10/80 | 05/05/14 | PDF File | ||
Synchronization of the AGS rf to External Oscillat ... | AD | BNL-104006-2014-TECH | Raka, E | 01/30/81 | 05/05/14 | PDF File | ||
Spectrum Analysis of LL Noise Under Synchronizatio ... | AD | BNL-104008-2014-TECH | Raka, E | Claus, J.; Cornacchia, M.; Gill, E.; Poole, J. |
02/06/81 | 05/05/14 | PDF File | |
MORE SEB EMITTANCE MEASUREMENTS | AD | BNL-104596-2014-TECH | Weisberg, H | 02/17/81 | 08/27/14 | PDF File | ||
BUFFER READER MULTIPLEX SYSTEM | AD | BNL-104597-2014-TECH | Dabrowski, J | Gill, E; Naase, S. |
03/04/81 | 08/27/14 | PDF File | |
Looping analog data taking programs | AD | BNL-105809-2014-TECH | Stoehr, R | 03/13/81 | 09/16/14 | PDF File | ||
Costs of running FEB and SEB programs - combined a ... | AD | BNL-105810-2014-TECH | Carroll, A | 04/01/81 | 09/16/14 | PDF File | ||
Data plotting and resistance calculation program | AD | BNL-105811-2014-TECH | Ewing, B | 04/29/81 | 09/16/14 | PDF File | ||
The H5 Kicker Test | AD | BNL-104009-2014-TECH | Weng, W | 05/07/81 | 05/05/14 | PDF File | ||
MEASUREMENTS OF THE PULSED FIELD IN THE NEW H-5 KI ... | AD | BNL-104598-2014-TECH | Nawrocky, R | 05/12/81 | 08/27/14 | PDF File | ||
SEB Beam Size vs. Intensity | AD | BNL-104010-2014-TECH | Weisberg, H | Glenn, J.W. |
06/11/81 | 05/05/14 | PDF File | |
AGS Internal Targets Operation Note | AD | BNL-104599-2014-TECH | Ryan, J | Gill, E. |
06/15/81 | 08/27/14 | PDF File | |
How to determine ?T (temperature differential), gi ... | AD | BNL-105812-2014-TECH | Dayton, D | 06/26/81 | 09/16/14 | PDF File | ||
To Determine Whether or Not F5 Losses Could be Red ... | AD | BNL-104011-2014-TECH | Barge, D | Glenn, J.W. |
07/01/81 | 05/05/14 | PDF File | |
H5 Fast Kicker Magnet Pulser | AD | BNL-104600-2014-TECH | Frey, W | Ghoshroy, S.; Cottingham, J.G. |
07/01/81 | 08/27/14 | PDF File | |
Beyond the vending machines: A listing of restaura ... | AD | BNL-105806-2014-TECH | Edwards, S | Lowenstein, E. |
07/01/81 | 09/16/14 | PDF File | |
D-Line study | AD | BNL-105814-2014-TECH | Brown, H | Bunce, G.; Glenn, J.W.; Naase, S. |
07/07/81 | 09/16/14 | PDF File | |
Beam Profile Monitors for the AGS | AD | BNL-104601-2014-TECH | Weisberg, H | 07/08/81 | 08/27/14 | PDF File | ||
The AGS Gauss Clock Reproducibility Test | AD | BNL-104012-2014-TECH | Weng, W | 07/09/81 | 05/05/14 | PDF File | ||
D-Line Study | AD | BNL-104013-2014-TECH | Bunce, G | Brown, H.; Glenn, J.W.; Naase, S. |
08/05/81 | 05/05/14 | PDF File | |
AGS Master Clock System | AD | BNL-104602-2014-TECH | Gabusi, J | Gill, E.; Koeppe, P.; Naase, S.; Zaharatos, R. |
08/20/81 | 08/27/14 | PDF File | |
20 Kilogauss solenoid magnet | AD | BNL-105815-2014-TECH | Li, J | Fang, G.Y.; Walker, J.C. |
08/28/81 | 09/16/14 | PDF File | |
Gauss Clock Stabilization of the Main Magnet Power ... | AD | BNL-104603-2014-TECH | Lambiase, R | 10/14/81 | 08/27/14 | PDF File | ||
The U Line--1981 | AD | BNL-104604-2014-TECH | Ryan, J | 11/05/81 | 08/27/14 | PDF File | ||
SEC Response to beam halo | AD | BNL-104605-2014-TECH | Glenn, J | 11/29/81 | 08/27/14 | PDF File | ||
Pulsed operation of experimental magnet power supp ... | AD | BNL-105813-2014-TECH | Hulliger, R | Soukas, A. |
12/09/81 | 09/16/14 | PDF File |