Title | Dept | BNL Number | Primary Author | BNL Author | Other Authors | Publication Date | Submittal Date | |
---|---|---|---|---|---|---|---|---|
<< < 27 28 29 30 31 > | ||||||||
D.C. beam separator electrode sheets stud fastenin ... | AD | BNL-105740-2014-TECH | Walker, J | 02/13/69 | 09/16/14 | PDF File | ||
FAST-SLOW EXTRACTION AT F10 INDUCED BY THE FAST KI ... | AD | BNL-104493-2014-TECH | Blumberg, L | Soukas, A.V. |
01/20/69 | 08/27/14 | PDF File | |
An overview of particle flux models for 2000 GeV s ... | AD | BNL-105739-2014-TECH | Toohig, T | 12/26/68 | 09/16/14 | PDF File | ||
G10 Be0 ceramic target, its location, and related ... | AD | BNL-105738-2014-TECH | Tanguay, G | 12/16/68 | 09/16/14 | PDF File | ||
INVESTIGATION OF A HIGH VOLTAGE BREAKDOWN PROBLEM ... | AD | BNL-104492-2014-TECH | Sluyters, T | 12/10/68 | 08/27/14 | PDF File | ||
STATUS OF THE NEW FAST KICKER DESIGN | AD | BNL-104491-2014-TECH | Fruitman, M | 12/09/68 | 08/27/14 | PDF File | ||
Recent improvements in the performancce of the ele ... | AD | BNL-105737-2014-TECH | Loper, R | 12/03/68 | 09/16/14 | PDF File | ||
AN ISOLATION CIRCUIT FOR CONTROL ROOM POWER SUPPLI ... | AD | BNL-104490-2014-TECH | Vogel, U | 10/31/68 | 08/27/14 | PDF File | ||
Design of an 800 MeV/c separated beam II | AD | BNL-105736-2014-TECH | Fox, J | 10/14/68 | 09/16/14 | PDF File | ||
DESIGN OF A VACUUM SYSTEM FOR SPARE DUOPLASMATRON ... | AD | BNL-104489-2014-TECH | Clarke, P | 10/08/68 | 08/27/14 | PDF File | ||
A DUOPLASMATRON WITH OSCILLATING EECTRONS | AD | BNL-104488-2014-TECH | Sluyters, T | 09/27/68 | 08/27/14 | PDF File | ||
Production of muons by proton scraping in the slow ... | AD | BNL-105735-2014-TECH | Fox, J | 09/12/68 | 09/16/14 | PDF File | ||
Design of three bending magnets for use with beam ... | AD | BNL-105734-2014-TECH | Filler, L | 08/26/68 | 09/16/14 | PDF File | ||
A schematic outline of the extension of the SEB in ... | AD | BNL-105733-2014-TECH | Toohig, T | 07/11/68 | 09/16/14 | PDF File | ||
SLOW EXTERNAL BEAM SEPTUM AND EJECTOR ASSEMBLIES | AD | BNL-104487-2014-TECH | Pallas, F | 06/26/68 | 08/27/14 | PDF File | ||
Beam sharing compatiblity between internal and ext ... | AD | BNL-105732-2014-TECH | Toohig, T | 06/26/68 | 09/16/14 | PDF File | ||
Experimental planning and support - CY 67 | AD | BNL-105731-2014-TECH | Sanford, J | 06/17/68 | 09/16/14 | PDF File | ||
On secondary particle production from an EPB targe ... | AD | BNL-105730-2014-TECH | Toohig, T | 06/13/68 | 09/16/14 | PDF File | ||
REMANENT FIELDS AND THEIR LONGITUDINAL AXIS IN AGS ... | AD | BNL-104486-2014-TECH | Vogel, U | 05/17/68 | 08/27/14 | PDF File | ||
NOTES ON EXTRACTED BEAMS | AD | BNL-104485-2014-TECH | Forsyth, E | Grisoli, J.J. |
04/23/68 | 08/27/14 | PDF File | |
A possible muon channel at the AGS and its relevan ... | AD | BNL-105729-2014-TECH | Toohig, T | 04/18/68 | 09/16/14 | PDF File | ||
EXPERIMENTER TIMING AND INTENSITY INFORMATION | AD | BNL-104483-2014-TECH | Watts, A | 04/16/68 | 08/27/14 | PDF File | ||
AERO VAC AVA-1 RESIDUAL GAS ANALYZER OPERATING PRO ... | AD | BNL-104484-2014-TECH | Schuchman, J | 04/15/68 | 08/27/14 | PDF File | ||
Comparative testing of NIM Discriminators EG&G-TR2 ... | AD | BNL-105728-2014-TECH | Redmond, L | Huebsch, W.R. |
04/05/68 | 09/16/14 | PDF File | |
DESIGN OF THE NEW FAST KICKER | AD | BNL-104482-2014-TECH | Fruitman, M | Forsyth, E.B. |
03/28/68 | 08/27/14 | PDF File | |
CONSTRUCTION AND TESTING OF THE HIGH GRADIENT ACCE ... | AD | BNL-104480-2014-TECH | Amari, R | 03/20/68 | 08/27/14 | PDF File | ||
METAL C-RING VACUUM SEALS FOR AGS | AD | BNL-104481-2014-TECH | Schuchman, J | 03/18/68 | 08/27/14 | PDF File | ||
MAGNETIC INFLECTOR FOR 200 MeV INJECTION,. | AD | BNL-104479-2014-TECH | Hsieh, H | 02/08/68 | 08/27/14 | PDF File | ||
BACKLEG WINDINGS | AD | BNL-104478-2014-TECH | Pallas, F | 01/31/68 | 08/27/14 | PDF File | ||
Post-conversion research facilities | AD | BNL-105727-2014-TECH | Sanford, J | 01/17/68 | 09/16/14 | PDF File | ||
EPOXY BONDING TESTS FOR THE HIGH GRADIENT ACCELERA ... | AD | BNL-104477-2014-TECH | Senator, S | 01/08/68 | 08/27/14 | PDF File | ||
QUARTERLY STATUS REPORT (10) PREINJECTOR GROUP | AD | BNL-104476-2014-TECH | Sluyters, T | 01/02/68 | 08/27/14 | PDF File | ||
AGS substations | AD | BNL-105726-2014-TECH | Sullivan, J | 12/04/67 | 09/16/14 | PDF File | ||
SENSITIVITY COMPARISON OF HELIUM LEAK DETECTOR VS ... | AD | BNL-104475-2014-TECH | Schuchman, J | 11/15/67 | 08/27/14 | PDF File | ||
The beam dump in the slow external proton beam (SE ... | AD | BNL-105725-2014-TECH | Toohig, T | 10/30/67 | 09/16/14 | PDF File | ||
Calculations for the backstop and shielding for th ... | AD | BNL-105724-2014-TECH | Toohig, T | 09/06/67 | 09/16/14 | PDF File | ||
Design of an 800 MeV/c separated beam to be operat ... | AD | BNL-105723-2014-TECH | Fox, J | 07/19/67 | 09/16/14 | PDF File | ||
SHORT COLUMN PROGRESS (9) | AD | BNL-104474-2014-TECH | Sluyters, T | 07/06/67 | 08/27/14 | PDF File | ||
Description and use of separated beam 1a to the 31 ... | AD | BNL-105722-2014-TECH | Brown, H | 06/20/67 | 09/16/14 | PDF File | ||
2-3 GeV/c particle beams from the G-10 4.7¿ beam a ... | AD | BNL-105720-2014-TECH | Read, A | Rubinstein, R. |
05/18/67 | 09/16/14 | PDF File | |
G-10 Target | AD | BNL-105721-2014-TECH | Sanford, J | 05/18/67 | 09/16/14 | PDF File | ||
Empirical formulas for particle production in P-Be ... | AD | BNL-105715-2014-TECH | Sanford, J | Wang, C.L. |
05/01/67 | 09/16/14 | PDF File | |
Technical Program in FY 66 | AD | BNL-105719-2014-TECH | Sanford, J | 04/12/67 | 09/16/14 | PDF File | ||
Shorter separators for beam 3 | AD | BNL-105717-2014-TECH | Foelsche, H | 03/27/67 | 09/16/14 | PDF File | ||
METAL VACUUM SEALS FOR THE AGS | AD | BNL-104473-2014-TECH | Schuchman, J | 03/23/67 | 08/27/14 | PDF File | ||
The G-10 = 4.7¿ pion beam (4-16 GeV/c) at the Broo ... | AD | BNL-105718-2014-TECH | Read, A | 03/10/67 | 09/16/14 | PDF File | ||
Empirical formulas for particle production in P-Be ... | AD | BNL-105714-2014-TECH | Sanford, J | Wang, C.L. |
03/01/67 | 09/16/14 | PDF File | |
AGS OPERATIONS -SUMMARY FOR 1966 | AD | BNL-104472-2014-TECH | Adams, R | 02/15/67 | 08/27/14 | PDF File | ||
AGS VACUUM SEALS | AD | BNL-104471-2014-TECH | Schuchman, J | 02/02/67 | 08/27/14 | PDF File | ||
NEWTRAP, A PDP-8 MONITOR, DEBUGGING PROGRAM | AD | BNL-104470-2014-TECH | Stewart, C | 01/24/67 | 08/27/14 | PDF File | ||
Empirical formula for inclusive proton spectra bet ... | AD | BNL-105716-2014-TECH | Wang, C | 01/01/67 | 09/16/14 | PDF File | ||
PROGRESS REPORT (7) CONCERNING SHORT COLUMN | AD | BNL-104469-2014-TECH | Sluyters, T | 12/28/66 | 08/27/14 | PDF File | ||
LO-LOAD METAL SEALS | AD | BNL-104468-2014-TECH | Schuchman, J | 10/20/66 | 08/27/14 | PDF File | ||
METAL SEALS FOR THE 1/2 SUPERPERIOD PUMPING MOCK-U ... | AD | BNL-104467-2014-TECH | Schuchman, J | 10/10/66 | 08/27/14 | PDF File | ||
0-VAL METAL SEALS (Del Mfg.Co) | AD | BNL-104465-2014-TECH | Schuchman, J | 08/23/66 | 08/27/14 | PDF File | ||
THE NEXT FAST KICKER | AD | BNL-104464-2014-TECH | Forsyth, E | 07/25/66 | 08/27/14 | PDF File | ||
BEAM MEASUREMENT WITH THE FAST KICKER | AD | BNL-104463-2014-TECH | Watts, A | 06/16/66 | 08/27/14 | PDF File | ||
TRIP REPORT - CALIFORNIA June 6-11, 1966 | AD | BNL-104462-2014-TECH | Schuchman, J | 06/14/66 | 08/27/14 | PDF File | ||
SHORT COLUMN PROGRESS REPORT | AD | BNL-104460-2014-TECH | Sluyters, T | 04/18/66 | 08/27/14 | PDF File | ||
SUPPRESSION OF VERTICAL COHERENCE IN THE AGS | AD | BNL-104461-2014-TECH | Raka, E | 04/18/66 | 08/27/14 | PDF File | ||
SOME ADDITIONAL EMITTANCE RESULTS WITH THE MARK II ... | AD | BNL-104459-2014-TECH | Wroe, H | 03/30/66 | 08/27/14 | PDF File | ||
DETAILS OF THE OXIDE CATHODES USED IN THE AGS DUOP ... | AD | BNL-104458-2014-TECH | Wroe, H | 03/29/66 | 08/27/14 | PDF File | ||
A METHOD OF INTERCHANGING HORIZONTAL AND VERTICAL ... | AD | BNL-104457-2014-TECH | Maschke, A | 03/25/66 | 08/27/14 | PDF File | ||
REPORT ON TRIP TO CAMBRIDGE ELECTRON ACCELERATOR | AD | BNL-104453-2014-TECH | Schuchman, J | 03/18/66 | 08/27/14 | PDF File | ||
AGS OPERATIONS SUMMARY FOR 1965 | AD | BNL-104456-2014-TECH | Adams, R | 03/11/66 | 08/27/14 | PDF File | ||
MULTITURN EXTRACTION FROM AN AGS | AD | BNL-104455-2014-TECH | Maschke, A | 03/08/66 | 08/27/14 | PDF File | ||
PROGRESS REPORT (4) CONCERNING HIGH GRADIENT COLUM ... | AD | BNL-104452-2014-TECH | Sluyters, T | 03/04/66 | 08/27/14 | PDF File | ||
MAIN MAGNET POWER SUPPLY ELECTRONIC PEAKERS INSTRU ... | AD | BNL-104454-2014-TECH | Otis, A | 02/21/66 | 08/27/14 | PDF File | ||
SURVEY OF AVAILABLE BELLOWS SEALED VACUUM VALVES | AD | BNL-104451-2014-TECH | Schuchman, J | 02/03/66 | 08/27/14 | PDF File | ||
STATUS REPORT (3) CONCERNING HIGH GRADIENT COLUMN ... | AD | BNL-104450-2014-TECH | Sluyters, T | 11/30/65 | 08/27/14 | PDF File | ||
HOLLOW METAL O-RING VACUUM SEALS | AD | BNL-104449-2014-TECH | Schuchman, J | 11/10/65 | 08/27/14 | PDF File | ||
OPERATION OF THREE ELECTRONIC LEAK DETECTORS | AD | BNL-104448-2014-TECH | Schuchman, J | 10/19/65 | 08/27/14 | PDF File | ||
A HOLLOW METAL O-RING AS A VACUUM SEAL FOR THE AGS ... | AD | BNL-104447-2014-TECH | Schuchman, J | 10/11/65 | 08/27/14 | PDF File | ||
STATUS REPORT (2) CONCERNING HIGH GRADIENT PREINJE ... | AD | BNL-104446-2014-TECH | Sluyters, T | 09/28/65 | 08/27/14 | PDF File | ||
High gradient column dividing resistors | AD | BNL-104445-2014-TECH | Damm, R | 08/24/65 | 08/27/14 | PDF File | ||
AUTOMATIC TARGET TRANSFER SYSTEM | AD | BNL-104444-2014-TECH | Christianson, C | 07/26/65 | 08/27/14 | PDF File | ||
MG SET VOLTAGE RECORDER | AD | BNL-104443-2014-TECH | Cassel, R | 07/23/65 | 08/27/14 | PDF File | ||
Status Report Preinjector (1) | AD | BNL-104442-2014-TECH | Sluyters, T | 07/21/65 | 08/27/14 | PDF File | ||
LOW ENERGY K BEAM | AD | BNL-104466-2014-TECH | Berley, D | 06/11/65 | 08/27/14 | PDF File | ||
Magnetic measurements of AGS experimental beam qua ... | AD | BNL-105713-2014-TECH | Danby, G | Jackson, J.W. |
12/02/63 | 09/16/14 | PDF File | |
Magnetic measurements of AGS experimental magnets | AD | BNL-105712-2014-TECH | Danby, G | 12/26/61 | 09/16/14 | PDF File | ||
Equipment protection system for CBETA | AD | BNL-211705-2019-TECH | Banerjee, Nilanjan | Berg, J. | Bartnik, A; Brooks, S; Dobbins, J; Gulliford, C; H ... |
03/28/19 | 05/21/19 | PDF File |
Initial performance of the magnet system in the sp ... | AD | BNL-209090-2018-TECH | Crittenden, J. | Berg, J. | Bartnik, A.; Bass, R.M.; Burke, D.; Dobbins, J.; G ... |
06/03/18 | 09/26/18 | PDF File |
Sens-Tech XDAS Readout System | AD | BNL-221290-2021-TECH | Chiang, I-Hung | Jao, Stepen | Bartosz, F. |
10/24/14 | 04/12/21 | PDF File |
The effects of a finite beam pipe on resistive wal ... | AD | BNL-212012-2019-TECH | Christie, Jonathan | Peggs, Stephen | 08/06/19 | 08/21/19 | PDF File | |
Hysteresis and degaussing of H1 dipole magnets | AD | BNL-211964-2019-TECH | Fabus, Marco | Peggs, Stephen | 07/30/19 | 08/05/19 | PDF File | |
Shielding of the CBETA electron dump | AD | BNL-211963-2019-TECH | Kostroun, V.O. | Peggs, Stephen | 07/13/19 | 08/05/19 | PDF File | |
Radiation dosages for NbFeB magnets in CBETA | AD | BNL-211714-2019-TECH | Petrullo, Joseph | Peggs, Stephen | Banerjee, N. |
05/07/19 | 05/22/19 | PDF File |
ERL Timing and optimized CBETA models | AD | BNL-211962-2019-TECH | Koscica, Rosalyn | Peggs, Stephen | 05/01/19 | 08/05/19 | PDF File | |
Beam commissioning results from the CBETA fraction ... | AD | BNL-211713-2019-TECH | Gulliford, Colwyn | Peggs, Stephen | Banerjee, N; Bartnik, A; Crittenden, J; Dobbins, J ... |
04/10/19 | 05/22/19 | PDF File |
Notes on CBETA dump shield | AD | BNL-211715-2019-TECH | Kostroun, V. | Peggs, Stephen | 03/05/19 | 05/22/19 | PDF File | |
CBETA 4-pass orbit correction and tolerance study | AD | BNL-211704-2019-TECH | Lou, William | Peggs, Stephen | 11/29/18 | 05/21/19 | PDF File | |
Development and validation of a Geant4 radiation s ... | AD | BNL-211700-2019-TECH | MacFadden, Nathaniel | Peggs, Stephen | Gulliford, C. |
11/01/18 | 05/21/19 | PDF File |
Nonlinear BPM positions using Poisson | AD | BNL-211699-2019-TECH | Bartnik, Adam | Peggs, Stephen | 09/28/18 | 05/21/19 | PDF File | |
Online simulation tools for orbit correction in th ... | AD | BNL-211678-2019-TECH | Nunez-delPrado, Antonett | Peggs, Stephen | Gulliford, C. |
09/27/18 | 05/16/19 | PDF File |
First tests of electron beam transport in the CBET ... | AD | BNL-209093-2018-TECH | Biddulph-West, Eric | Peggs, Stephen | 09/06/18 | 09/26/18 | PDF File | |
A review of various methods of detecting and measu ... | AD | BNL-209092-2018-TECH | Morris, Arthur | Peggs, Stephen | 08/21/18 | 09/26/18 | PDF File | |
TM 6: Fractional Arc Test - beam through MLC & gir ... | AD | BNL-209089-2018-TECH | Bartnik, Adam | Peggs, Stephen | 04/20/18 | 09/26/18 | PDF File | |
Status of the CBETA splitter common magnet design | AD | BNL-209040-2018-TECH | Crittenden, J.A. | Peggs, Stephen | Bass, R.M.; Burke, D.A.; Smolenski, K.W. |
09/08/17 | 09/12/18 | PDF File |
Comprehensive tracking study for the H-dipoles and ... | AD | BNL-209087-2018-TECH | Bass, Rachel | Peggs, Stephen | Crittenden, J. |
08/10/17 | 09/26/18 | PDF File |